Pineview Plaza
Number: Grading-31329

Drawing of Record Submitted 06/10/2005
Electronic Drawing 06/10/2005
Final Grading Report 01/27/2005
Date Scheduled 06/14/2005
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 06/16/2005 Approved per Dennis Wright.. The Only parts of the Plaza Finaled are Ashley Furniture and The Threaters.
Water 06/14/2005 Corrections required per Tim Jones.. Nothing corrected from last Final Punch List.. 08/01/2005 Corrections required per Boyd.. Concrete all valves. Fire Hydrant and meter boxes. 09/16/2005 Corrections required per Tim.. No drawing of records. Valve collars in 2450 E have no pipe sizes cut into collar. Meter box on corner of Red Cliffs Dr and 2450 E needs pad poured around. Meter boxes in front of Ashley Furn. need pads poured. Valve collar in middle entry needs arrows and pipe sizes, meter boxes and hydrant on Red Cliffs Dr by middle entry need pads poured. Hydrant on Western Entrance needs pad poured. Meter box for Ashley Furn needs pad poured. Valve collar on 2450 E south end Ashley Furn needs pipe size cut in. Hydrant in front of Stadium 10 has no locate wire. All hydrants need to be cleaned and painted on extensions. 09/28/2006 Corrections required per Tim Dotson.. See Punch list
Wastewater 06/14/2005 Corrections required per Tim Jones.. Nothing corrected from last Final Punch List.. 08/01/2005 Corrections required per Boyd.. Concrete all valves. Fire Hydrant and meter boxes. 09/16/2005 Corrections required per Tim.. No drawing of records. Valve collars in 2450 E have no pipe sizes cut into collar. Meter box on corner of Red Cliffs Dr and 2450 E needs pad poured around. Meter boxes in front of Ashley Furn. need pads poured. Valve collar in middle entry needs arrows and pipe sizes, meter boxes and hydrant on Red Cliffs Dr by middle entry need pads poured. Hydrant on Western Entrance needs pad poured. Meter box for Ashley Furn needs pad poured. Valve collar on 2450 E south end Ashley Furn needs pipe size cut in. Hydrant in front of Stadium 10 has no locate wire. All hydrants need to be cleaned and painted on extensions. 09/28/2006 Corrections required per Tim Dotson.. See Punch list
Engineering 08/02/2005 Corections required per Larry Henderson. Nothing on previous punch list done(6-14-05) 09/19/2005 Corrections required per Larry H.. Met with Bill and discussed s/w backfill as prioity for public safety
City Development Engineer 08/02/2005 Approved per Jay Sandberg For Phase 1 Only (Furniture Store and Theatres.Bldg #400.)
Landscaping 08/02/2005 Corections required per Ray Synder..City Forester to review street tree requirements. 08/02/2005 Corrections required per Matt C. 1. Plant trees on South Side of Red Cliffs Dr according to comm. Forestry plan. Trees on Northside do no meet agreement between developer and City.to replace existing trees. Problems should be addressed through Kent Perkins. 09/16/2005 Corrections required per Doug W... No Trees 09/21/2005 Corrections required per Ray S. Satisfy City Forester that street ordinance has been complete with 10/02/2006 Approved Per Jay Sandberg
    
General Comments: