[Foremaster Ridge III]
Number: Grading-33185

Drawing of Record Submitted 3 copies 08/29/2005.revised 2-9-2006
Electronic Drawing 08/29/2005.revised 2-9-2006
Final Grading Report 02/09/2006
Date Scheduled
BUILDING PERMIT RELEASE APPROVALS
Power 06/24/2005 Approved per Dennis Wright Ok For Permits Only.. No Power
Water 07/01/2005 Corrections required per Carson Tait.. Not ready yet. 07/15/2005 Need valves exposed.. lots marked. 07/28/2005 Approved per Tim Jones.. Permits Only..Phone call @ 11:45
Wastewater 07/01/2005 Corrections required per Carson Tait.. Not ready yet. 07/15/2005 Need valves exposed.. lots marked. 07/28/2005 Approved per Tim Jones.. Permits Only..Phone call @ 11:45
Engineering 06/24/2005 Corrections required per Larry Henderson.. SUBDIVISON NOT COMPLETE 07/14/2005 Corrections required per Larry Henderson. Complete subdivison improvements. 07/28/2005 (Permits Only for #LOT 301) No permits for project.per Larry Henderson
City Development Engineer 06/28/2005 Corrections required per Wesley Jenkins.. Sanitary sewer man holes to be installed.. base course for sidewalk,base course for Crestline Drive. Finish grading for Crestline Drive. 07/19/2005 Corrections required per Wes Jenkins. Sanitary sewer man holes to be installed and backfilled.Install base course for Crestline Drive and finish grading. Provide water main stubs to future phases and backfill. 07/27/2005 Approved per Wes Jenkins.. Permist only
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 09/06/2005. Corrections required per Dennis Wright.. Power not ready 09/26/2005 Approved per Dennis Wright 1/9/07 1 year warranty Approved per Dennis Wright.
Water 09/23/2005 Approved per Carson Tait 1/9/07 - 1 year warranty - Corrections Required per Tim Dotson - Wire needs to be in working order.
Wastewater 09/23/2005 Approved per Carson Tait 1/9/07 - 1 year warranty - Corrections Required per Tim Dotson - Wire needs to be in working order.
Engineering 08/30/2005 Corrections required per Larry Henderson..Ramp end of sidewalks, collar manholes and valves,End of road signs, Pavement ends sign,remove manhole sections 09/23/2005 Corrections required per Larry Henderson.. Monuments 10/06/2005 Approved per Larry H
City Development Engineer 09/01/2005 Corrections required per Wes Jenkins.. Finish collaring manholes and valves, remove manhole from lot 303, install "not a through street" sign at end of paved road(northend). Install "Pavement Ends" sign at lot line between lots 311 and 312. Provide 10% guarantee bond. Final grading report should be submitted. 09/30/2005 Correctins required per Wesly Jenkins.. 10% guarantee Bond.. 2. Final gradinig report 01/06/2006 Approved per Wes Jenkins 1/19/07 - 1 year warranty Approved per Ken B.
Landscaping 08/29/2005 Approved per Mark Bradley N/A 1/19/07 - 1 year warranty Approved per Ken B.
    
General Comments:
Permits Only for All lots.. per Dick Simkins, Ron Reed, Matt Loo.8-17-05