[Cotton Manor Phase V]
Number: Grading 27719

Drawing of Record Submitted
Electronic Drawing
Final Grading Report
Date Scheduled
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 9/18/02 Corrections required as per Don Higgins - must sign a streetlight agreement with Terry at city offices 8/13/03 APPROVED as per Dennis.
Water 9/18/02 Approved as per Kevin Condie
Wastewater 9/18/02 Approved as per Kevin Condie
Engineering 9/18/02 Corrections required as per Mike Hester - complete monumentation 8/13/03 APPROVED as per Mike Hester
City Development Engineer 9/26/02 Corrections required as per Catherine Hasfurther - need Letter of Certification, as-builts, elec. as-builts, final plat, final grading report 8/13/03 APPROVED as per Catherine Hasfurther. 02/11/2005 Approved per Cathy Hasfurther.
Landscaping 9/16/02 Approved as per Doug Wulfenstein
    
General Comments: