South Point Phase X
Number: Grading-32326

Drawing of Record Submitted 06/23/2005
Electronic Drawing 06/23/2005
Final Grading Report 06/23/2005
Date Scheduled 06/28/2005
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 07/18/2005 Approved per Dennis Wright 7/11/06 - 1 year warranty final inspection okay per Dennis Wright.
Water 07/01/2005 Corrections Required Per Tim Jones..No pipe size cut into valve can collars.. One valve could not get to open or close. 07/08/2005 Approved Per Tim Jones
Wastewater 07/01/2005 Corrections Required Per Tim Jones..No pipe size cut into valve can collars.. One valve could not get to open or close. 07/08/2005 Approved Per Tim Jones
Engineering 06/28/2005 Corrections required per Larry Henderson..Sidewalks, street lights. Raise subdrain co @ 2860 East and 410 North. Clean up oil const debris. remove forms from water meter pads. 07/13/2005 Corrections required per Larry Henderson.. Waiting for bond. 08/03/2005 Approved per Larry Henderson Cathy said bond ok 7/19/06 1 year warranty - Corrections required per Carlos R. Sidewalks? Handicap ramps? Is this finished?
City Development Engineer 07/12/2005 Corrections Required Per Cathy H.. Electronic Dwg of Record.. Letter from Geotech on Core drill holes(asphalt).. Bond for sidewalk.. 08/03/2005 Approved per Cathy H. Need Bond from Linda 7/19/06 1 year warranty - Corrections required per Ken B. Sidewalks? Handicap ramps? Is this finished?
Landscaping 07/12/2005 Approved per Mark Bradley N/A 8/3/06 1 year warranty (PARKS) per Ken B
    
General Comments: