Tuweap Point Phase I
Number: Grading 32929

Drawing of Record Submitted 06/27/2005
Electronic Drawing 06/27/2005
Final Grading Report 06/27/2005
Date Scheduled 06/29/2005
BUILDING PERMIT RELEASE APPROVALS
Power
Water 07/15/2005 Approved per Kevin Condie per phone call from Kevin.. 9:15am
Wastewater 07/15/2005 Approved per Kevin Condie per phone call from Kevin.. 9:15am
Engineering 07/14/2005 Approved per Larry Henderson
City Development Engineer 07/14/2005 Approved per Jason Draper
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 07/08/2005 Approved per Dennis Wright 12/5/06 1 year warranty Approved per Dennis Wright.
Water 07/08/2005 Corrections required per Kevin Condie.. Lot #63 straighten setter in box. Clean fire hydrants, put in line size in valve collars, no concrete around Irr. meter, need to raise phase line valve to finish grade, need to wire together in valve lines, need Record of Drawing. 08/10/2005 Corrections required per Kevin Condie..Action need to get w/our Blue Stakes and work out problem w/wire locate His # 703-248-. Phase line valve has irrigation lid need to be changed to water lid.. Record of drawing 08/17/2005 Approved per Boyd 04/30/2007 Approved per Kevin Condie.. 1 year warranty
Wastewater 07/08/2005 Corrections required per Kevin Condie.. Lot #63 straighten setter in box. Clean fire hydrants, put in line size in valve collars, no concrete around Irr. meter, need to raise phase line valve to finish grade, need to wire together in valve lines, need Record of Drawing. 08/10/2005 Corrections required per Kevin Condie..Action need to get w/our Blue Stakes and work out problem w/wire locate His # 703-248-. Phase line valve has irrigation lid need to be changed to water lid.. Record of drawing 08/17/2005 Approved per Boyd 04/30/2007 Approved per Kevin Condie.. 1 year warranty
Engineering 06/29/2005 Corrections required per Larry Henderson..Get permits for Rockwalls, Shoulder asphalt on Tuweep. Ramp end of sidewalk. install street lights, unwrap handicap ramp inserts, clean water meter lids. re-install school x-ing sign 2200 west. remove building materials from sidewalk and clean SW on 2200 west. Clean inlet boxes, Trim expansion joints-- complete detention basin. 07/07/2005 Corrections required per Larry Henderson..Pour sidewalk on 2100 West.Complete detention basin,replace end of read marker lot #24. Remove stucco mix from sidewalk on 2100 West. Remove cover on 2100 West. 07/27/2005 Corrections required per Larry Henderson.. Complete detention basin 08/10/2005 Corrections required per Larry Henderson.,. Remove const. stuff from Westside of Tuweap 08/15/2005 Appproved per Larry Henderson 1/22/07 - 1 year warranty - Approved per Brandon Wright.
City Development Engineer 07/13/2005 Corrections required per Jason Draper.. Detention Basin 07/18/2005 Private Development,Electronic DWG of Recrod, Grates on pipe in detention basin.Clean up construction debris West of Tuweep Dr. 08/24/2005 Corrections Required Per Cathy H...Electronic DWG of record-ok1. Private development certificate, 2. Grout around pipe at outlet of detention basin. 3. Retain earth between wall and rock water feature(by detention area). 4. Engineer needs to address sight distance and submit info. to City Engineering Dept. 10/27/2005 Corrections required per Cathy H. Private development cert--ok, grout around pipe @ detention basin(outlet pipe-ok into box) retain earth by detention-ok. Sight distance- revise from EOA 01/05/2006 Approved per Cathy H 12/27/2006 Approved per Ken Bricer 1 year warranty..
Landscaping 07/11/2005 Approved per Doug W. Trees planted. 07/15/2005 Corrections required per Mark Bradley.. Install landscape between sidewalk and privacy wall. 08/22/2005 Approved per Mark Bradley.. Phase 1 only.. Wall,landscape between wall and sidewalk, and trees to be completed prior to phase 2 FINAL. 12/27/2006 Approved per Ken Bricker 1 year warrranty
    
General Comments: