Drawing of Record Submitted |
06/28/2005(3 copies)Revised.. 07/12/2005 |
Electronic Drawing |
06/28/2005.Revised..,07/12/2005 |
Final Grading Report |
07/05/2005 |
Date Scheduled |
07/06/2005 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
07/06/2005 Approved per Dennis Wright |
Water |
07/07/2005 Corrections required per Tim Jones.. No arrows or pipe size cut into valve can collars.. Drawing of Records are not correct.
07/13/2005 Approved per Tim Jones.. Corrections made. |
Wastewater |
07/07/2005 Corrections required per Tim Jones.. No arrows or pipe size cut into valve can collars.. Drawing of Records are not correct.
07/13/2005 Approved per Tim Jones.. Corrections made. |
Engineering |
07/07/2005 Corrections required per Larry Henderson..Clean trash from detention basin. Raise and collar storm drain, clean out shoulder edge of apshalt.
07/07/2005 Approved per Larry Henderson |
City Development Engineer |
07/13/2005 Approved per Jason Draper |
Landscaping |
07/08/2005 Approved Per Ray Sydner |
| |
General Comments: |
|