Drawing of Record Submitted |
05/01/2006 |
Electronic Drawing |
05/01/2006 e-mail |
Final Grading Report |
05/18/2006 |
Date Scheduled |
05/23/2006 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
5/24/06 Approved per Tim Dotson |
Wastewater |
5/24/06 Approved per Tim Dotson |
Engineering |
06/06/2006 Approved per Carlos Robles |
City Development Engineer |
5/25/06 Correction required per Ken B for Jay Sandberg - Tools and materials laying in driveway at the South end of building. Missing caps on sp rinkler system hookup. Missing solid steel doors on dumpster enclosure. Missing parking bumpers next to building. 6/5/06 Approved with conditions per Jay Sandberg. All areas not complete. Bldg. C approved. CO inspection required for each building. |
Landscaping |
5/25/06 Correction required per Ken B for Jay Sandberg - Landscaping is incomplete accros the front of the lot, at River Road and along South end. 6/5/06 Approved with conditions per Jay Sandberg. All areas not complete. Bldg. C approved. CO inspection required for each building. |
| |