Drawing of Record Submitted |
01/12/2006 |
Electronic Drawing |
01/12/2006 |
Final Grading Report |
01/12/2006 |
Date Scheduled |
01/18/2006 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
01/30/2006 Approved per Wayne M.#1 only..
03/10/2006 Corrections required per Wayne M.. FOR ALL buildings. Need to have backflow cert Fire system in BLdg #2 and 4. |
Wastewater |
01/30/2006 Approved per Wayne M.#1 only..
03/10/2006 Corrections required per Wayne M.. FOR ALL buildings. Need to have backflow cert Fire system in BLdg #2 and 4. |
Engineering |
01/18/2006 Corrections required per Larry Henderson. Tie in bike path, grout pipes in inlet boxes, complete retention pond, clean bike path
01/27/2006 Approved per Larry Henderson Phase 1 Only |
City Development Engineer |
01/18/2006 Corrections required per Cathy H.. Complete site work
01/27/2006 Approved per Jay Sandberg Phase 1 Only |
Landscaping |
01/26/2006/..Approved per Ray Synder..Bldg 1 shell only: Landscape not installed.. trash enclosure not installed. Received check for $30,000 to cover L/S and T/E on 1-26-06.. Ck.#1533. (To be complete by Feb 28,2006). |
| |
General Comments: |
|