Drawing of Record Submitted |
05/10/2006 |
Electronic Drawing |
05/10/2006 |
Final Grading Report |
05/10/2006 |
Date Scheduled |
05/11/2006 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
05/15/2006 Approved per Per Dennis Wright
4/5/07 1 year warranty approved per Dennis Wright. |
Water |
05/12/2006 Approved per Tim Dotson |
Wastewater |
05/12/2006 Approved per Tim Dotson |
Engineering |
05/23/2006 Approved per Carlos Robles |
City Development Engineer |
05/16/2006 Corrections required per Cathy H..1. Trim and grout around storm drain pipe in inlet box. 2. Electronic DWG of record needs to be sent in auto cad format. Include pts ofg as-builts shots.. Where does storm drain outlet? look for it behind 2 adjacent lots and could not find. 5/31/06 Approved per Cathy H
4/13/07 - 1 year warranty - per Cathy H. Private parking lot - NA for inspection. |
Landscaping |
05/16/2006 Approved per Cathy H.
4/13/07 - 1 year warranty - per Cathy H. Private parking lot - NA for inspection. |
| |
General Comments: |
|