| Drawing of Record Submitted | |
|---|---|
| Electronic Drawing | |
| Final Grading Report | |
| Date Scheduled | |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | 09/12/2005 Corrections required per Kevin Condie.. Need to raise valve in asphalt concrete pad. 09/29/2005 Approved per Boyd Roundy Permits Only |
| Wastewater | 09/12/2005 Corrections required per Kevin Condie.. Need to raise valve in asphalt concrete pad. 09/29/2005 Approved per Boyd Roundy Permits Only |
| Engineering | 08/30/2005 Approved per Larry Henderson |
| City Development Engineer | 08/30/2005 Approved per Jay Sandberg.. Permits only |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 09/16/2005 Corrections required per Kevin Condie.. NOT READY. said he would call when ready.. no call |
| Wastewater | 09/16/2005 Corrections required per Kevin Condie.. NOT READY. said he would call when ready.. no call |
| Engineering | |
| City Development Engineer | |
| Landscaping | 01/19/2007 Approved per Ke Bricker.. 1 yr warranty |
| General Comments: | |