Drawing of Record Submitted |
05/23/2006 |
Electronic Drawing |
05/23/2006 |
Final Grading Report |
05/23/2006 |
Date Scheduled |
05/24/2006 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
5/24/06 - Approved per Dennis Wright (Nissan Bldg ONLY). |
Water |
5/24/06 Corrections required per Kevin C. Check wire. Clean plastic off bottom of firehydrant and paint. FOR CO need backflows on fire system and irrigation tested, turn on fire system valve.
05/25/2006 Approved per Kevin Condie
04/23/2007 Approved per Kevin Condie.. 1 yr warranty |
Wastewater |
5/24/06 Corrections required per Kevin C. Check wire. Clean plastic off bottom of firehydrant and paint. FOR CO need backflows on fire system and irrigation tested, turn on fire system valve.
05/25/2006 Approved per Kevin Condie
04/23/2007 Approved per Kevin Condie.. 1 yr warranty |
Engineering |
5/31/06 Approved per Carlos R. |
City Development Engineer |
5/25/06 Corrections Required per Ken B for Jay Sandberg - Trash in storm drain inlet. Construction materials laying in gutter. Dirt covering sidewalk. General cleanup needed. Fire hydrant facing the wrong direction. Installing fence in front of fire hydrant - too close. 5/31/06 Approved per Jay Sandberg.
5/17/2007 Approved per Cathy H. 1 yr warranty.. need to check Hilton Dr only (public street) |
Landscaping |
5/25/06 Corrections Required per Ken B for Jay Sandberg - still installing grass. |
| |
General Comments: |
|