R.V. Sales (Desert Coach)
Number: Grading-34968

Drawing of Record Submitted 01/25/2007
Electronic Drawing 01/25/2007
Final Grading Report 01/29/2007
Date Scheduled 01/31/2007
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 1/31/07 Approved per Dennis Wright. 3/8/08 1 year warranty approved per Dennis Wright.
Water 1/31/07 Approved per Wayne McIntosh. 3/10/2008 Approved per Darrin Judd.. 1 yr warranty.. 1" copper serivce, no fire line
Wastewater 1/31/07 Approved per Wayne McIntosh. 3/10/2008 Approved per Darrin Judd.. 1 yr warranty.. 1" copper serivce, no fire line
Engineering 02/22/2007 Approved per Carlos Robles.. 1 year check culdesac and road 3/17/2008 Approved per Carlos Robles.. 1 yr warranty
City Development Engineer 01/31/2006 Corrections required per Ken Bricker..Construction materials on site, dirt piles in parking lot, trash in detention area, curb at access needs replaced. 04/11/2007 Approved per Jay Sandberg.. Approved by Planning 3/6/08 - 1 year warranty - approved per Ken B.
Landscaping 01/31/2007 Corrections required per Ken Bricker.. Plans call for 16 trees on Freeway side of building.( Only 9 are there.. 7 more required. Per Jay S. adjacent to building. 04/11/2007 Only 8 trees are present on the Freeway side of the lot. Approved by planning 3/6/08 - 1 year warranty - approved per Ken B.
    
General Comments: