Drawing of Record Submitted |
07/19/2006 |
Electronic Drawing |
07/19/2006 |
Final Grading Report |
07/21/2006 |
Date Scheduled |
07/26/2006 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
7/25/06 Approved per Dennis Wright
6/5/07 1 year warranty approved per Dennis Wright. |
Water |
7/26/06 Approved per Tim Dotson
6/7/07 - 1 year warranty - approved per Dustin Bracken. |
Wastewater |
7/26/06 Approved per Tim Dotson
6/7/07 - 1 year warranty - approved per Dustin Bracken. |
Engineering |
7/26/06 Corrections required per Carlos R. Driveway. Catch basin. Settlement on JUC Trench. 7/28/06 Approved per Carlos R. |
City Development Engineer |
7/28/06 Approved per Brett Bingham.
09/06/2006 No Mounment on Site.. Re-Check on Oct. 31 per Jay Sandberg
11/15/06 Approved per Jay Sandberg.
6/5/07 1 year warranty - corrections required per Ken B. Inspected Sunland Dr (public street) only. Ramp at sidewalk (320 East) is required. Cracks and chips in shoulder at curb, ramp at sidewalk on other end is also required. |
Landscaping |
7/28/06 Approved per Jay/Brett Bingham -- with condition -- missing trees will be installed when monument is installed. No later than end of August 2006.
09/06/2006 Approved per Ken B. ( No Monument on site..)re-check on Oct 31,2006 for monumnet per Jay Sandberg
6/5/07 1 year warranty - corrections required per Ken B. Inspected Sunland Dr (public street) only. Ramp at sidewalk (320 East) is required. Cracks and chips in shoulder at curb, ramp at sidewalk on other end is also required. |
| |
General Comments: |
|