Drawing of Record Submitted |
11/24/2006 |
Electronic Drawing |
11/24/2006 |
Final Grading Report |
11/17/2006 |
Date Scheduled |
11/27/2006 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
11/27/06 Approved per Dennis Wright
11/06/2007 Approved per Dennis Wright 1 year warranty |
Water |
11/28/06 Corrections Required Per Tim Dotson - Need concrete pad around hydrant. Arrows in valve collars. Pipe sizes.
12/04/2006 Approved per Tim Dotson
11/07/2007 Approved per Tim Dotson..1 year warranty |
Wastewater |
11/28/06 Corrections Required Per Tim Dotson - Need concrete pad around hydrant. Arrows in valve collars. Pipe sizes.
12/04/2006 Approved per Tim Dotson
11/07/2007 Approved per Tim Dotson..1 year warranty |
Engineering |
11/28/2006 Corrections required per Carlos Roble.. Curb and sidewalk on Riverside Dr needs to be replaced.
12/11/2006 Approved per Carlos Robles. Building H Only |
City Development Engineer |
11/27/06 Approved per Cathy H.
11/9/07 - 1 year warranty (Riverside Dr Improvements only) - approved per Ken B. |
Landscaping |
11/27/06 Approved per Cathy H. Landscaping will need to be completed on Bldg I prior to CO.
11/9/07 - 1 year warranty (Riverside Drive Improvements only) - approved per Ken B. |
| |
General Comments: |
|