Drawing of Record Submitted |
02/21/2006 |
Electronic Drawing |
02/21/2006 |
Final Grading Report |
02/27/2006 |
Date Scheduled |
03/06/2006 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
03/07/2006 Approved per Dennis Wright
4/5/07 1 year warranty approved per Dennis Wright. |
Water |
03/08/2006 Approved per Kevin Condie
04/16/2007 1 yr warranty.. 1 yr warranty.. Problem w/wire need to be fixed. |
Wastewater |
03/08/2006 Approved per Kevin Condie
04/16/2007 1 yr warranty.. 1 yr warranty.. Problem w/wire need to be fixed. |
Engineering |
03/07/2006 Approved per Carlos Robles
4/5/07 1 year warranty Not Applicable per Brandon Wright - Private subdivision does not impact city right of way. |
City Development Engineer |
03/23/2006 corrections required per Wes Jenkins..1. Provide private development improvement certificate. 2. Provide rock wall certification letter for all lots. 3. Provide as-builts grading plan showing all rock walls. Plan should be stamped by geotechincal engineer acknowleduaing final grading meets recommendations in the geotechnical report.
05/23/2006 Approved Wes Jenkins
4/13/07 - 1 year warranty - per Cathy H. Private streets - NA for inspection. |
Landscaping |
05/23/2006 Approved per Wes Jenkins
4/13/07 - 1 year warranty - per Cathy H. Private streets - NA for inspection. |
| |
General Comments: |
|