| Drawing of Record Submitted | 06/06/2006 |
|---|---|
| Electronic Drawing | 06/06/2006 |
| Final Grading Report | 06/06/2006 |
| Date Scheduled | 06/07/2006 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | 06/09/2006 Approved per Dennis Wright |
| Water | 6/12/06 Approved per Kevin C. |
| Wastewater | 6/12/06 Approved per Kevin C. |
| Engineering | 6/13/06 Corrections Required per Carlos R. Clean out inlet boxes. Cut pipes inside inlet boxes. Install and stamp monuments. 06/21/2006 Approved per Carlos R. |
| City Development Engineer | 06/15/2006 Corrections required per Brett Bingham. Provide dimension from TBC to the cleanout on Drawing of records. make corections and then resubmit. 7/6/06 Corrections required per Cathy H. Hillside compliance letter. Rock wall certifications. Revised dwg of record. 6/14/2007 Approved per Cathy H |
| Landscaping | 06/14/2006 Corrections required per Brett B..Landscape is not done. 6/15/2007 Approved per Cathy H |
| General Comments: | |