Drawing of Record Submitted |
09/19/2005 |
Electronic Drawing |
09/19/2005 |
Final Grading Report |
09/19/2005 |
Date Scheduled |
09/20/2005 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
09/21/2005 Approved per Dennis Wright |
Water |
09/20/2005 Corrections required per Kevin Condie. Redo collar in street-concrete is broken. 2. test backflow, 3. Lower meter setter and box to grade of landscaping.4. After meter box is lowered put concrete around it w/rebar through box. 5. Fire sprinkler valve is off, 6. Arrow and line size on fire sprinkler valve
09/30/2005 Approved per Boyd Rowndy |
Wastewater |
09/20/2005 Corrections required per Kevin Condie. Redo collar in street-concrete is broken. 2. test backflow, 3. Lower meter setter and box to grade of landscaping.4. After meter box is lowered put concrete around it w/rebar through box. 5. Fire sprinkler valve is off, 6. Arrow and line size on fire sprinkler valve
09/30/2005 Approved per Boyd Rowndy |
Engineering |
09/20/2005 Corrections required per Larry H. Clean gutters, seal cracks in curb, scraps off spilled concrete
09/24/2005 Approved per Larry Henderson
09/27/2005 Approved per Larry Henderson |
City Development Engineer |
09/21/2005 Approved per Jay Sandberg |
Landscaping |
09/21/2005 Approved per Ray Synder |
| |
General Comments: |
|