Drawing of Record Submitted |
|
Electronic Drawing |
|
Final Grading Report |
|
Date Scheduled |
|
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
03/15/2006 Approved per Tim Dotson
6/12/07 1 year warranty - approved - per Wayne M - 6/12/07 locate wire is good, valve cans, meter boxes, hyd all look good. |
Wastewater |
03/15/2006 Approved per Tim Dotson
6/12/07 1 year warranty - approved - per Wayne M - 6/12/07 locate wire is good, valve cans, meter boxes, hyd all look good. |
Engineering |
03/14/2006 Corrections required per Carlos Robles.. Need to fix asphalt..
03/15/2006 Corrections required per Carlos R.. Fix asphalt.
04/06/2006 Approved per Matt Loo.. Final grading report.
9/28/2007 Approved per Carlos Robles 1 yr warranty |
City Development Engineer |
03/23/2006 Corrections required per Cathy H.. Hillside compliance letter, 10% warranty bond.
04/26/2006 Corrections required per Cathy H... Hillside compliance letter
05/16/2006.. Approved per Cathy H.
6/6/07 1 year warranty - corrections required per Ken B. End of road markers are missing at 2000 S & 2530 E. Rocks dirt and mud in gutters. Port-a-pot sitting on sidewalk. Construction materials in gutters. Dirt berms and heavy equipment are present. Cuts in asphalt. Curb shoulders chipped in places.
9/26/07 - 1 year warranty - approved per Ken B. |
Landscaping |
03/23/2006 Approved per Cathy H.
6/6/07 1 year warranty - corrections required per Ken B. End of road markers are missing at 2000 S & 2530 E. Rocks dirt and mud in gutters. Port-a-pot sitting on sidewalk. Construction materials in gutters. Dirt berms and heavy equipment are present. Cuts in asphalt. Curb shoulders chipped in places.
9/26/07 - 1 year warranty - approved per Ken B. |
| |
General Comments: |
|