| Drawing of Record Submitted | |
|---|---|
| Electronic Drawing | |
| Final Grading Report | |
| Date Scheduled | |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 03/15/2006 Approved per Tim Dotson 6/12/07 1 year warranty - approved - per Wayne M - 6/12/07 locate wire is good, valve cans, meter boxes, hyd all look good. |
| Wastewater | 03/15/2006 Approved per Tim Dotson 6/12/07 1 year warranty - approved - per Wayne M - 6/12/07 locate wire is good, valve cans, meter boxes, hyd all look good. |
| Engineering | 03/14/2006 Corrections required per Carlos Robles.. Need to fix asphalt.. 03/15/2006 Corrections required per Carlos R.. Fix asphalt. 04/06/2006 Approved per Matt Loo.. Final grading report. 9/28/2007 Approved per Carlos Robles 1 yr warranty |
| City Development Engineer | 03/23/2006 Corrections required per Cathy H.. Hillside compliance letter, 10% warranty bond. 04/26/2006 Corrections required per Cathy H... Hillside compliance letter 05/16/2006.. Approved per Cathy H. 6/6/07 1 year warranty - corrections required per Ken B. End of road markers are missing at 2000 S & 2530 E. Rocks dirt and mud in gutters. Port-a-pot sitting on sidewalk. Construction materials in gutters. Dirt berms and heavy equipment are present. Cuts in asphalt. Curb shoulders chipped in places. 9/26/07 - 1 year warranty - approved per Ken B. |
| Landscaping | 03/23/2006 Approved per Cathy H. 6/6/07 1 year warranty - corrections required per Ken B. End of road markers are missing at 2000 S & 2530 E. Rocks dirt and mud in gutters. Port-a-pot sitting on sidewalk. Construction materials in gutters. Dirt berms and heavy equipment are present. Cuts in asphalt. Curb shoulders chipped in places. 9/26/07 - 1 year warranty - approved per Ken B. |
| General Comments: | |