| Drawing of Record Submitted | 03/01/2006 |
|---|---|
| Electronic Drawing | 03/01/206 |
| Final Grading Report | 03/01/2006 |
| Date Scheduled | 03/09/2006 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | 02/16/2006 Approved per Larry Henderson |
| City Development Engineer | 03/01/2006 Approved per Cathy H |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 03/09/2006 Corrections required per Lee Keel.. Clean MH charge out lids, new Drawing of Records, grout in vents, plug in bottom MH-down stream side, S marks. 03/10/2006 Approved.. All corrections have been made 03/15/2006 Approved per Tim Dotson 9/27/2007 Approved per Carson Tait.. 1 year warranty.. |
| Wastewater | 03/09/2006 Corrections required per Lee Keel.. Clean MH charge out lids, new Drawing of Records, grout in vents, plug in bottom MH-down stream side, S marks. 03/10/2006 Approved.. All corrections have been made 03/15/2006 Approved per Tim Dotson 9/27/2007 Approved per Carson Tait.. 1 year warranty.. |
| Engineering | 03/10/2006 Corrections required per Carlos Robles.. Cut W driveways, stamp monuments, rockwall certifications,seal cracked curb, gutter/patch,clean sidewalk, trim exspancion joints,fix asphalt rock pockets (sand slurry entire projects). Street lights, stop sign @ 3000 East 2000 South 04/06/2006 Approved per Matt Loo.. Final Grading report. 7/16/2007 Approved per Carlos Robles 1 yr warranty |
| City Development Engineer | 03/23/2006 Corrections required per Cathy H.. Hillside compliance letter. 2. Clean up South shoulder along 2000 South and provide a 2' gravel base shoulder from edge of asphalt. 3. Rock line detention basin for erosion and maintance purpose. 4. 10% warranty bond 1 year. 5. In the Northeast ocrner mitigate ponding(elevation diff.) off the edge of asphalt. 04/26/2006 Corrections required per Cathy H. 1. Hillside compliance letter.2. Clean up East shoulder of 2780 Est and add 2' of gravel shoulder.3. See attached sheet w/pervious comments. 5/26/06 Corrections Required per Cathy H. - Clean debris out of detention basin. Grade slopes (East, South, North). Erosion control around outlets and inlets to detention needs work - more rock. 10% warranty bond. 6/6/06 Corrections required per Cathy H - 10% warranty bond. 07/10/2006 Approved per Cathy H. 7/11/07 - 1 year warranty - approved per Ken B. |
| Landscaping | 03/23/2006 Approved per Cathy H. 7/11/07 - 1 year warranty - approved per Ken B. |
| General Comments: | |