Serenity Hills Phase 1
Number: Grading-33960

Drawing of Record Submitted 03/01/2006
Electronic Drawing 03/01/206
Final Grading Report 03/01/2006
Date Scheduled 03/09/2006
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering 02/16/2006 Approved per Larry Henderson
City Development Engineer 03/01/2006 Approved per Cathy H
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 03/09/2006 Corrections required per Lee Keel.. Clean MH charge out lids, new Drawing of Records, grout in vents, plug in bottom MH-down stream side, S marks. 03/10/2006 Approved.. All corrections have been made 03/15/2006 Approved per Tim Dotson 9/27/2007 Approved per Carson Tait.. 1 year warranty..
Wastewater 03/09/2006 Corrections required per Lee Keel.. Clean MH charge out lids, new Drawing of Records, grout in vents, plug in bottom MH-down stream side, S marks. 03/10/2006 Approved.. All corrections have been made 03/15/2006 Approved per Tim Dotson 9/27/2007 Approved per Carson Tait.. 1 year warranty..
Engineering 03/10/2006 Corrections required per Carlos Robles.. Cut W driveways, stamp monuments, rockwall certifications,seal cracked curb, gutter/patch,clean sidewalk, trim exspancion joints,fix asphalt rock pockets (sand slurry entire projects). Street lights, stop sign @ 3000 East 2000 South 04/06/2006 Approved per Matt Loo.. Final Grading report. 7/16/2007 Approved per Carlos Robles 1 yr warranty
City Development Engineer 03/23/2006 Corrections required per Cathy H.. Hillside compliance letter. 2. Clean up South shoulder along 2000 South and provide a 2' gravel base shoulder from edge of asphalt. 3. Rock line detention basin for erosion and maintance purpose. 4. 10% warranty bond 1 year. 5. In the Northeast ocrner mitigate ponding(elevation diff.) off the edge of asphalt. 04/26/2006 Corrections required per Cathy H. 1. Hillside compliance letter.2. Clean up East shoulder of 2780 Est and add 2' of gravel shoulder.3. See attached sheet w/pervious comments. 5/26/06 Corrections Required per Cathy H. - Clean debris out of detention basin. Grade slopes (East, South, North). Erosion control around outlets and inlets to detention needs work - more rock. 10% warranty bond. 6/6/06 Corrections required per Cathy H - 10% warranty bond. 07/10/2006 Approved per Cathy H. 7/11/07 - 1 year warranty - approved per Ken B.
Landscaping 03/23/2006 Approved per Cathy H. 7/11/07 - 1 year warranty - approved per Ken B.
    
General Comments: