| Drawing of Record Submitted | 03/17/2006..revised 03/23/20065 |
|---|---|
| Electronic Drawing | 03/17/2006..revised 03/23/2006 |
| Final Grading Report | 03/17/2006 |
| Date Scheduled | 03/22/2006 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | 03/30/2006 Corrections required per Carlos Robles.. Grading report. 04/05/2006 Corrections required per Carlos Robles.. Grading Report |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 03/22/2006 Approved per Wayne M. 6/6/07 - 1 year warranty - approved per Dustin Bracken. |
| Wastewater | 03/22/2006 Approved per Wayne M. 6/6/07 - 1 year warranty - approved per Dustin Bracken. |
| Engineering | 03/23/2006 Corrections required per Carlos R.. Corrections on grading report. 03/30/2006 Corrections required per Carlos Robles.. Grading report 04/05/2006 Corrections required per Carlos Robles.. Grading Report 04/06/2006 Approved per Matt Loo.. Final Grading Report 7/20/2007 Approved per Carlos Robles 1 yr warranty |
| City Development Engineer | 04/03/2006 Corrections required per Cathy H. 1. 10% warranty bond. 2. Roadway improvements at end of 2350 East needs to be bonded for (provide estimate from Engineer). 3. Provide deed of dedication for piece going to City(copy). 04/01/2006 Corrections required per Cathy H... Complete Final 4/6/2006 APPROVED per Cathy H 3/5/07 - 1 year warranty - Corrections required per Ken B - Curbing needs R/R, asphalt needs R/R in several locations, road sunken in, pot holes in street, sidewalk needs R/R. 7/17/2007 Approved per Cathy H.. 1 yr warranty |
| Landscaping | 04/03/2006 Approved per Cathy H.. N/A 3/5/07 1 year warranty Approved per Cathy H. |
| General Comments: | |