[Red Butte Phase IV]
Number: Grading-35313

Drawing of Record Submitted 03/17/2006..revised 03/23/20065
Electronic Drawing 03/17/2006..revised 03/23/2006
Final Grading Report 03/17/2006
Date Scheduled 03/22/2006
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering 03/30/2006 Corrections required per Carlos Robles.. Grading report. 04/05/2006 Corrections required per Carlos Robles.. Grading Report
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 03/22/2006 Approved per Wayne M. 6/6/07 - 1 year warranty - approved per Dustin Bracken.
Wastewater 03/22/2006 Approved per Wayne M. 6/6/07 - 1 year warranty - approved per Dustin Bracken.
Engineering 03/23/2006 Corrections required per Carlos R.. Corrections on grading report. 03/30/2006 Corrections required per Carlos Robles.. Grading report 04/05/2006 Corrections required per Carlos Robles.. Grading Report 04/06/2006 Approved per Matt Loo.. Final Grading Report 7/20/2007 Approved per Carlos Robles 1 yr warranty
City Development Engineer 04/03/2006 Corrections required per Cathy H. 1. 10% warranty bond. 2. Roadway improvements at end of 2350 East needs to be bonded for (provide estimate from Engineer). 3. Provide deed of dedication for piece going to City(copy). 04/01/2006 Corrections required per Cathy H... Complete Final 4/6/2006 APPROVED per Cathy H 3/5/07 - 1 year warranty - Corrections required per Ken B - Curbing needs R/R, asphalt needs R/R in several locations, road sunken in, pot holes in street, sidewalk needs R/R. 7/17/2007 Approved per Cathy H.. 1 yr warranty
Landscaping 04/03/2006 Approved per Cathy H.. N/A 3/5/07 1 year warranty Approved per Cathy H.
    
General Comments: