[Terraces @ Seven Hills Phase I]
Number: Grading-33684

Drawing of Record Submitted 10/12/2005
Electronic Drawing 10/12/2005
Final Grading Report 10/12/2005
Date Scheduled 10/13/2005
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer 10/13/2005 Approved per Wes Jenkins Permits Only
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 10/13/2005 Approved per Rick 12/5/06 1 year warranty Approved per Dennis Wright.
Water 10/13/2005 Approved per Kevin Condie 1/26/07 - 1 year warranty - Approved. Checked all wire on the project it was all good per Wayne McIntyre
Wastewater 10/13/2005 Approved per Kevin Condie 1/26/07 - 1 year warranty - Approved. Checked all wire on the project it was all good per Wayne McIntyre
Engineering 10/13/2005 Approved per Larry Henderson 1/2/07 1 year warranty - Corrections required per Brandon Wright. Broken walk from traffic. Cracked curb. Need some type of erosion control - sediment is running into strom drain.
City Development Engineer 10/13/2005 Corrections required per Wes Jenkins.. Sidewalk not complete. To be completed prior to Final Inspection. Re-do curb for sidewalk at lot 11 prior to Final Inspection.Moisture barrior behind wall required at lot 11 prior to Final.. Landscaping to be completed prior to CO 01/25/2006 Approved per Wes Jenkins 12/27/2006 Corrections required per Ken bricker.. Remove trash dumpster and building materials from sidewalks,general cleanup needed.
Landscaping 10/13/2005 Approved per Doug W. 10/13/2005 Corrections required per Mark Bradley.. Walls along rear lot line of lots 6-10 were not built per approved const drawings and exceed zone regulation height. Options: rebuild to plans or provide revised drawing ,obtain adjacent property owners signtures and obtain approval by planning commission. 01/25/2006 Approved Per Mark Bradly.. Wall issue between the two property owners. 12/27/2006 Approved Per Ken Bricker 1 year warranty
    
General Comments: