Sportman's Warehouse
Number: Grading-35375

Drawing of Record Submitted 03/10/2006
Electronic Drawing 03/10/2006
Final Grading Report 03/10/2006
Date Scheduled 03/14/2006
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 03/14/2006 Approved per Dennis Wright 2/7/07 - 1 year warranty - Approved per Dennis Wright
Water 03/16/2006Corrections required per Kevin Condie..1. Arrow in valve collars, 2. Redo-#2 arrow-- in valve collars in project.3. Test backflow, 4. Need to test wire.5. Need to check valves. 20/20/2007 Approved per Wayne M.. 1 year warranty Checked wire passed, project looked good. 03/20/2006 Approved per Kevin Condie
Wastewater 03/16/2006Corrections required per Kevin Condie..1. Arrow in valve collars, 2. Redo-#2 arrow-- in valve collars in project.3. Test backflow, 4. Need to test wire.5. Need to check valves. 20/20/2007 Approved per Wayne M.. 1 year warranty Checked wire passed, project looked good. 03/20/2006 Approved per Kevin Condie
Engineering 03/15/2006 Corrections required per Carlos Robles..Not enough test on storm drain, don't have anything from CTI (concrete, asphalt or gradations). 03/31/2006 Approved per Carlos Robles
City Development Engineer 03/13/2006 Corrections required per Jay Sandberg..Access agreement not executed, easement for sight distance not executed. Electroinc drawing submited. 03/31/2006 Approved per Jay Sandberg.. Easement for site distance submitted deed of dedication for decel lane submitted access agreement exceuted. 02/14/2007 Approved per Ken Bricker.. 1 yr warranty
Landscaping 03/24/2006 Approved per Doug W. Please call for reinspect.. Remove landscape stakes from trees, if they need restaking use stakes made away from tree. 03/28/2006 Approved per Doug W. 02/14/2007 Approved per Ken Bricker..1 yr warranty
    
General Comments: