River Hollow Phase IV
Number: Grading-35413

Drawing of Record Submitted 06/12/2006
Electronic Drawing 06/12/2006
Final Grading Report 06/12/2006
Date Scheduled 06/13/2006
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 06/14/2006 Approved per Tim Dotson 05/14/2007 Approved per Carson Tait.. 1 year warranty
Wastewater 06/14/2006 Approved per Tim Dotson 05/14/2007 Approved per Carson Tait.. 1 year warranty
Engineering 6/13/06 Approved per Carols R. 8/21/2007 Approved per Carlos Robles 1 yr warranty
City Development Engineer 06/29/2006 Approved per Brett B. 5/10/07 1 year warranty - corrections required per Ken B. 2580 E sunken in with water standing in pool and not draining. 8/21/07 - 1 year warranty - corrections required per Cathy H. Remove and replace curb at location shown on subdivision plat.
Landscaping 06/29/2006 Approved per Brett B. 5/10/07 1 year warranty approved per Ken B.
    
General Comments: