| Drawing of Record Submitted | 7/17/2007..7/19/2007 |
|---|---|
| Electronic Drawing | 7/17/2007..7/19/2007 |
| Final Grading Report | 7/17/2007 |
| Date Scheduled | 7/19/2007 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | 7/18/2007 Approved per Dennis Wright |
| Water | 7/19/2007 Corrections required per Tim Dotson..wire is good, need collar around meter box and arrow in valve box on fire line.. need backflow cards. 7/23/2007 corrections required per Carson Tait.. need backflow tags needs rebar in meter as to spec for St George. 7/30/2008 Approved per Carson Tait |
| Wastewater | 7/19/2007 Corrections required per Tim Dotson..wire is good, need collar around meter box and arrow in valve box on fire line.. need backflow cards. 7/23/2007 corrections required per Carson Tait.. need backflow tags needs rebar in meter as to spec for St George. 7/30/2008 Approved per Carson Tait |
| Engineering | 7/20/2007 Approved per Carlos R. |
| City Development Engineer | 7/18/2007 Corrections required per Ken Bricker.. Provide electronic Dwg of record in City HCN System.dumpster/storage has been relocated(not built to plans) 7/27/07 corrections required per Cathy H. Missing 2 parking stalls from approved plans. |
| Landscaping | 7/18/2007.. corrections required per Ken Bricker.. landscape in comp. gravel pile in street landscape at islands is incomp. general cleanup needed landscapeincomp. at NE corner landscape curb has broken shoulders R/R. 7/23/07 corrections required per Ken B. Landscape at island is missing. Landscaping is incomplete at ADA ramp. Boulder inside 10' TBC easement. 1/17/2008 Approved per Ken Bricker |
| General Comments: | |