Rim Rock Commerical Center Phase 1
Number: Grading-35531

Drawing of Record Submitted 7/17/2007..7/19/2007
Electronic Drawing 7/17/2007..7/19/2007
Final Grading Report 7/17/2007
Date Scheduled 7/19/2007
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 7/18/2007 Approved per Dennis Wright
Water 7/19/2007 Corrections required per Tim Dotson..wire is good, need collar around meter box and arrow in valve box on fire line.. need backflow cards. 7/23/2007 corrections required per Carson Tait.. need backflow tags needs rebar in meter as to spec for St George. 7/30/2008 Approved per Carson Tait
Wastewater 7/19/2007 Corrections required per Tim Dotson..wire is good, need collar around meter box and arrow in valve box on fire line.. need backflow cards. 7/23/2007 corrections required per Carson Tait.. need backflow tags needs rebar in meter as to spec for St George. 7/30/2008 Approved per Carson Tait
Engineering 7/20/2007 Approved per Carlos R.
City Development Engineer 7/18/2007 Corrections required per Ken Bricker.. Provide electronic Dwg of record in City HCN System.dumpster/storage has been relocated(not built to plans) 7/27/07 corrections required per Cathy H. Missing 2 parking stalls from approved plans.
Landscaping 7/18/2007.. corrections required per Ken Bricker.. landscape in comp. gravel pile in street landscape at islands is incomp. general cleanup needed landscapeincomp. at NE corner landscape curb has broken shoulders R/R. 7/23/07 corrections required per Ken B. Landscape at island is missing. Landscaping is incomplete at ADA ramp. Boulder inside 10' TBC easement. 1/17/2008 Approved per Ken Bricker
    
General Comments: