Drawing of Record Submitted |
5/14/2008 |
Electronic Drawing |
5/14/2008 |
Final Grading Report |
5/14/2008 |
Date Scheduled |
5/19/2008 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
5/19/2008 Corrections required per Dennis Wright..Power conduits will be in approved City Right of Way or easement before project cna be passed off. |
Water |
5/23/2008 Approved per Carson Tait.. no water lines are in this section of roadway |
Wastewater |
5/23/2008 Approved per Carson Tait.. no water lines are in this section of roadway |
Engineering |
5/19/2008..Corrections required Per Mike Smith..Finish drainage as per plans call for re-inspect,interstate rock needs to address East side asphalt cracking and checking, re-submitt Drawing of Record, showing corrected items.Finish cleaning up shoulders and excavated materials along project, and trash debris, as[plat remove 5 concrete columns sta 2 tool marked finish dressing shoulders as per plan page C-5.
7/8/2008
Corrections required per Mike Smith..Finish rock drainage ditch as per plans. Drawing of record needs to be updated storm drain pipe flow line elevations.MH lid elevations invert elevations,etc. also include street names. Remove elec vault from "As Builts" it is not installed yet. |
City Development Engineer |
5/29/2008.. Corrections required per Jay Sandberg..Rock piles present in road, no rip-rap installed. Update drawing to use current street names and locations. Electronic Dwg of record- provide drainage info such as MH inverts, flow lines, length, type scope of pipe. etc. End section on pipe upstream |
Landscaping |
5/29/2008 Corrections required per Ken Bricker..Rock piles present in road, no rip-rap installed. Update drawing to use current street names and locations. Electronic Dwg of record- provide drainage info such as MH inverts, flow lines, length, type scope of pipe. etc. |
| |
General Comments: |
|