Twin Lakes Phase II
Number: Grading-35621

Drawing of Record Submitted 5/14/2008
Electronic Drawing 5/14/2008
Final Grading Report 5/14/2008
Date Scheduled 5/19/2008
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 5/19/2008 Corrections required per Dennis Wright..Power conduits will be in approved City Right of Way or easement before project cna be passed off.
Water 5/23/2008 Approved per Carson Tait.. no water lines are in this section of roadway
Wastewater 5/23/2008 Approved per Carson Tait.. no water lines are in this section of roadway
Engineering 5/19/2008..Corrections required Per Mike Smith..Finish drainage as per plans call for re-inspect,interstate rock needs to address East side asphalt cracking and checking, re-submitt Drawing of Record, showing corrected items.Finish cleaning up shoulders and excavated materials along project, and trash debris, as[plat remove 5 concrete columns sta 2 tool marked finish dressing shoulders as per plan page C-5. 7/8/2008 Corrections required per Mike Smith..Finish rock drainage ditch as per plans. Drawing of record needs to be updated storm drain pipe flow line elevations.MH lid elevations invert elevations,etc. also include street names. Remove elec vault from "As Builts" it is not installed yet.
City Development Engineer 5/29/2008.. Corrections required per Jay Sandberg..Rock piles present in road, no rip-rap installed. Update drawing to use current street names and locations. Electronic Dwg of record- provide drainage info such as MH inverts, flow lines, length, type scope of pipe. etc. End section on pipe upstream
Landscaping 5/29/2008 Corrections required per Ken Bricker..Rock piles present in road, no rip-rap installed. Update drawing to use current street names and locations. Electronic Dwg of record- provide drainage info such as MH inverts, flow lines, length, type scope of pipe. etc.
    