Drawing of Record Submitted |
7/17/03 |
Electronic Drawing |
|
Final Grading Report |
|
Date Scheduled |
|
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
04/01/2003 Approved per Judd Burgess for permits only on lots #231 through #239 |
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
7/23/2003. Corrections required per Jeff Lance. Need to find valve on 2295 South Rolling Hills Dr. Clean and paint fire hydrant at end of Rolling Hills Dr. Need to turn fire hydrant to street 769 W. and paint bottom. Backflow on both 2" meters need to be inspected. Need to check wire.
08/22/2203. Corrections required per jeff Lance. Need to install value on windsor drive and rollings hillm and one value collar. Need record of drawing.
8/27/2003. Approved per Jeff Lance. |
Wastewater |
7/23/2003. Corrections required per Jeff Lance. Need to find valve on 2295 South Rolling Hills Dr. Clean and paint fire hydrant at end of Rolling Hills Dr. Need to turn fire hydrant to street 769 W. and paint bottom. Backflow on both 2" meters need to be inspected. Need to check wire.
08/22/2203. Corrections required per jeff Lance. Need to install value on windsor drive and rollings hillm and one value collar. Need record of drawing.
8/27/2003. Approved per Jeff Lance. |
Engineering |
08/01/2003. Corrections required per Larry Henderson. Install sidewalk on southside of Rolling Hills Dr. from Southgate Hills to Windsor Dr. on north or south side of Windsor Dr. from Rolling Hills to existing. Install street name and stop signs.
8/26/03 - Approved Larry. |
City Development Engineer |
07/30/2003. Corrections required per Judd. Final Plat needs to be recorded.
8/19/2003. Approved per Judd. |
Landscaping |
07/18/2003. Approved per Mark Bradley. |
| |
General Comments: |
|