| Drawing of Record Submitted | 07/10/2006 |
|---|---|
| Electronic Drawing | 07/12/2006 |
| Final Grading Report | 07/12/2006 |
| Date Scheduled | 07/12/2006 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | 7/11/06 - Approved per Dennis Wright 6/5/07 1 year warranty approved per Dennis Wright. |
| Water | 07/12/2006 Approved per Darrin 07/19/2006 Approved per Kevin Condie 6/7/07 - 1 year warranty - approved per Dustin Bracken. |
| Wastewater | 07/12/2006 Approved per Darrin 07/19/2006 Approved per Kevin Condie 6/7/07 - 1 year warranty - approved per Dustin Bracken. |
| Engineering | 07/12/2006 Corrections required per Brandon Wright/Carlos..Patch curb & sidewalks, replace collars on sewer, handicap ramps. 07/19/2006 Approved per Brandon Wright 6/6/07 1 year warranty approved per Brandon Wright. |
| City Development Engineer | 07/19/2006 Approived per Cathy H. Contact when ADA ramps(tiles) 6/5/07 1 year warranty - corrections required per Ken B. (Inspected only Diagonal and 700 W (public streets)) — Chip missing on curb shoulder on Diagonal Street. |
| Landscaping | 07/19/2006 Approved per Cathy H. Landscaping onsite does not match City Plans approval..See Final/site inspection card for remarks. 6/5/07 1 year warranty - corrections required per Ken B. (Inspected only Diagonal and 700 W (public streets)) — Chip missing on curb shoulder on Diagonal Street. |
| General Comments: | |