| Drawing of Record Submitted | |
|---|---|
| Electronic Drawing | |
| Final Grading Report | 04/02/2003 |
| Date Scheduled | 04/03/2003 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | 05/29/2003. Corrrections required. per Mike Heston Complete the original punch list 06/09/2003. Corrections required per MEA 1. Clean the excess concrets from the monument housing. 06/19/2003. Approved per Mike Hester |
| City Development Engineer | |
| Landscaping | 05/29/2003. Corrections required per Mark Bradley. Fix wall as discussed with wife Joe K. and Donna w/Miya Landscaping and landscape planter strip with Street trees alon 2450 So 06/23/2003. Corrections required per Mark Bradley. Install Landscape. 07/10/2003. Approved per doug W. Landscape is in but Doug W. needs to approve street trees along 2450 So. 07/10/2003. Approved per Doug W. Street trees along 2450 So. |
| General Comments: | |