Drawing of Record Submitted |
12/12/2005 |
Electronic Drawing |
e-mail @ lonnie 12/28/2005 |
Final Grading Report |
01/11/2006 |
Date Scheduled |
12/29/2005 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
01/03/2006 Approved per Dennis Wright
2/7/07 - 1 year warranty - Approved per Dennis Wright |
Water |
01/03/2006 Corrections required per Tim Jones..Hydrant need to be painted down to concrete.. No water marks at meter boxes. Need W cut out into curb.
01/25/2006 Approved per Wayne M. ..All corrections have been made |
Wastewater |
01/03/2006 Corrections required per Tim Jones..Hydrant need to be painted down to concrete.. No water marks at meter boxes. Need W cut out into curb.
01/25/2006 Approved per Wayne M. ..All corrections have been made |
Engineering |
12/29/05- Corrections Required per Larry Henderson - Outlet box and pipe from detention basis. Final grading report.
01/11/2006 Corrections require per Larry Henderson.. Grading report.. Upper detention basin corrections.
01/27/2006 Corrections required per Larry Henderson.. Detention pond corrections
03/30/2006 Approved per Carlos Robles |
City Development Engineer |
01/11/2006 Corrections required per Cathy H. 1. Build curb as shown on the plans that is along the West Hillside (per Plan). 2. Detention area between bldg 5 & 6 is not built per plan-- (pipe is way to high). 3. Provide rockwall design and new plan show walls on westside of project. 4. Complete per plan.
02/01/2006 Corrections required per Cathy H. See comments on previous inspection card
02/07/2006 Corrections required per Cathy Hasfurther.. 1. Build curb and gutter on West side as per plan by Rockwall or show that curb is not needed-place car bumper along rockwall.2. Build detention per plan on West
03/01/2006 Approved per Cathy H. |
Landscaping |
01/06/2006 Trail to be resolved/Parks Dept.Dumpster areas-- address Entrance landscape required 1990 East and 344 South.. Curbing- BLdg 6: along Hillside witing parking lot,paint curb- no parking. Bldg 9. West side by rockwall.. Revegetate area by wash east of bldg 9.
01/30/2006 Corrections required per Mark Bradley..Dumpster striping not yet completed.. Entrance landscaping not yet completed at 1900 East and 344 South.
03/09/2006 Approved per Mark Bradley.. Satisfied prior request. There is no water to the Southside of 1990 East 344 South. I/S.
04/14/2006.. Corrections required per Cathy H.. Complete landscaping at South entrnace per plan
04/21/2006 Approved per Cathy H. OK per Mark Bradley - Landscaping change from plan is okay.
02/14/2007 Approved per Ken Bricker.. 1 year warranty |
| |
General Comments: |
|