[H & E Equipment Rentals]
Number: Grading-36032

Drawing of Record Submitted 09/28/2006
Electronic Drawing 09/28/2006
Final Grading Report 09/28/2006
Date Scheduled 10/10/2006
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 10/10/06 Corrections Required per Tim Dotson - Needs concrete around hydrant and meter box as per spec for St Geroge. Valve cans need to be plumb and able to get valve wrench on it and concrete around them. 10/23/06 Corrections Required per Wayne M - Valve cans are not plumb they poured concrete but didn't fix the valve cans still unable to get value wrench on valves and no locate wire in valve cans? Redo concrete and fix valve gas. 10/27/06 Corrections Required per Tim Dotson - Need to pour concrete around valve cans. 11/3/06 Approved per Tim Dotson. 10/05/2007 Approved per Tim Dotson.. 1 year warranty
Wastewater 10/10/06 Corrections Required per Tim Dotson - Needs concrete around hydrant and meter box as per spec for St Geroge. Valve cans need to be plumb and able to get valve wrench on it and concrete around them. 10/23/06 Corrections Required per Wayne M - Valve cans are not plumb they poured concrete but didn't fix the valve cans still unable to get value wrench on valves and no locate wire in valve cans? Redo concrete and fix valve gas. 10/27/06 Corrections Required per Tim Dotson - Need to pour concrete around valve cans. 11/3/06 Approved per Tim Dotson. 10/05/2007 Approved per Tim Dotson.. 1 year warranty
Engineering 10/11/2006 Corrections required per Brandon Wright.. Need compaction test on cross gutters. 10/31/2006 Approved per Brandon W.
City Development Engineer 10/11/2006 Approved per Ken Bricker 11/14/06 Approved per Cathy H. Slope at Northeast corner. 10/9/07 - 1 year warranty - NA private parking lot per Cathy H.
Landscaping 10/11/2006 Corrections required per Ken Bricker.. Trash in detention area landscaping incomplete at frontage. 10/17/06 Corrections required per Ken B. Frontage construction still in progress. 10/9/07 - 1 year warranty - NA private parking lot per Cathy H. 10/31/06 Corrections Required per Ken B - relocate front sign and equipment parked along lot frontage - all of these items are blocking the access site distance onto River Road. French concrete in driving lane to main entrance. 10/20/2006 Corrections required per Ken B.. Sight Distance by power pole. 10/31/2006 Relocate front sign and equipment parked along lot frontage-all of these items are blocking the access site distance onto river road. Fresh concrete in driving lane to main entrance. 11/08/2006 Approved per Jay Sandberg
    
General Comments: