[Barnes Bank]
Number: Grading-36073

Drawing of Record Submitted 07/12/2006..revised 07/25/2006
Electronic Drawing 07/12/2006..
Final Grading Report 07/12/2006
Date Scheduled 07/18/2006
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 07/20/2006 Approved per Dennis Wright 6/5/07 1 year warranty approved per Dennis Wright.
Water 7/21/06 - Approved per Tim Dotson. 6/7/07 - 1 year warranty - corrections required per Dustin Bracken. 6/7/07 no tracer wire in valve can for fireline.
Wastewater 7/21/06 - Approved per Tim Dotson. 6/7/07 - 1 year warranty - corrections required per Dustin Bracken. 6/7/07 no tracer wire in valve can for fireline.
Engineering 07/19/2006 Corrections required per Carlos Robles..Fix Sidewalk, curb, storm boxes, light 07/21/2006 Corrections required per Brandon Wright.. Lights 7/27/06 Approved per Bradon Wright.
City Development Engineer 07/18/2006 Approved per Jay Sandberg..Striping to be completed by City-ok, Drawing of records submitted-ok. Some site work and cleanup still needed, see Engineering inspector comments. 6/6/07 1 year warranty - Corrections required per Ken B. Inspected only Red Cliffs Dr and 2720 E (public streets). Ramp is missing at sidewalk on East side.
Landscaping 07/18/2006 Approved per Jay Sandberg 6/6/07 1 year warranty - Corrections required per Ken B. Inspected only Red Cliffs Dr and 2720 E (public streets). Ramp is missing at sidewalk on East side.
    
General Comments: