Drawing of Record Submitted |
02/03/2006 |
Electronic Drawing |
02/03/2006 |
Final Grading Report |
02/03/2006 |
Date Scheduled |
02/08/2006 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
02/08/2006 Approved per Dennis Wright
1/9/07 1 year warranty Approved per Dennis Wright. |
Water |
02/09/2006 Approved per Kevin Condie.. This is not for the road in front.
01/17/2007 Approved per Kevin Condie.. 1 yr warranty |
Wastewater |
02/09/2006 Approved per Kevin Condie.. This is not for the road in front.
01/17/2007 Approved per Kevin Condie.. 1 yr warranty |
Engineering |
02/08/2006 Approved per Larry Henderson
1/17/07 - 1 year warranty - Corrections Required per Brandon Wright. Cracked walk on Ledges parkway and Winchester. Handicap ramp. |
City Development Engineer |
02/10/2006 Approved per Cathy H
01/23/2007 Approved per Ken Bricker.. 1yr warranty |
Landscaping |
02/10/2006 Approved per Ray Sydner.. This maintenace bldg was approved subject to the submitted of a check for $32,750.00 along with a copy of the landscape bid proposel for the same valve.(field inspected 2-9-06)
01/23/2007 Approved per Ken Bricker 1 yr warranty |
| |
General Comments: |
|