| Drawing of Record Submitted | 02/03/2006 |
|---|---|
| Electronic Drawing | 02/03/2006 |
| Final Grading Report | 02/03/2006 |
| Date Scheduled | 02/08/2006 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | 02/08/2006 Approved per Dennis Wright 1/9/07 1 year warranty Approved per Dennis Wright. |
| Water | 02/09/2006 Approved per Kevin Condie.. This is not for the road in front. 01/17/2007 Approved per Kevin Condie.. 1 yr warranty |
| Wastewater | 02/09/2006 Approved per Kevin Condie.. This is not for the road in front. 01/17/2007 Approved per Kevin Condie.. 1 yr warranty |
| Engineering | 02/08/2006 Approved per Larry Henderson 1/17/07 - 1 year warranty - Corrections Required per Brandon Wright. Cracked walk on Ledges parkway and Winchester. Handicap ramp. |
| City Development Engineer | 02/10/2006 Approved per Cathy H 01/23/2007 Approved per Ken Bricker.. 1yr warranty |
| Landscaping | 02/10/2006 Approved per Ray Sydner.. This maintenace bldg was approved subject to the submitted of a check for $32,750.00 along with a copy of the landscape bid proposel for the same valve.(field inspected 2-9-06) 01/23/2007 Approved per Ken Bricker 1 yr warranty |
| General Comments: | |