Drawing of Record Submitted |
07/07/2006 |
Electronic Drawing |
07/07/2006 |
Final Grading Report |
07/07/2006 |
Date Scheduled |
07/10/2006 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
07/17/2006 Approved per Dennis Wright
7/2/08 - 1 year warranty - approved per Dennis Wright. |
Water |
07/17/2006 Approved per Tim Dotson
7/7/2008 Approved per Carson Tait.. 1 year warranty.. wire good |
Wastewater |
07/17/2006 Approved per Tim Dotson
7/7/2008 Approved per Carson Tait.. 1 year warranty.. wire good |
Engineering |
07/11/2006 Corrections required per Carlos Robles..Grout inlet boxes,seal cracks & sidewalks,patch curb & sidewalks, asphalt in circle needs repair,Trim expansion joints.
07/19/2006 Approved per Carlos Robles
7/9/2008 Corrections required per Carlos Robles.. 1 year warranty.. Remove and replace all broken sidealks and handicap ramps
9/11/2008 Approved per Carlos Robles.. 1 yr warranty
|
City Development Engineer |
7/25/06 Corrections required per Cathy H. 10% warranty bond. Fix slope per plan.
08/09/2006 Approved per Brett Bingham
7/2/08 - 1 year warranty - Corrections REQUIRED per Ken B - sidewalk is cracked and settled throughout at least half of this project. Full thickness crack through curb on circle. Requires R/R.
9/10/08 - 1 year warranty - approved per Ken B. |
Landscaping |
7/25/06 Approved per Cathy H.
7/2/08 - 1 year warranty - Corrections REQUIRED per Ken B - sidewalk is cracked and settled throughout at least half of this project. Full thickness crack through curb on circle. Requires R/R.
9/10/08 - 1 year warranty - approved per Ken B. |
| |
General Comments: |
|