[Riverside Heights Phase G]
Number: Grading-32277

Drawing of Record Submitted 02/13/2006
Electronic Drawing 02/10/2006
Final Grading Report 02/10/2006
Date Scheduled 02/15/2006
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 02/16/2006 Approved per Dennis Wright.. This phase only 6/5/07 1 year warranty approved per Dennis Wright.
Water 01/17/2006 Corrections required per Wayne Macintosh.. Meet contractor and gave him a punch list to make corrections 03/03/2006 Corrections required per Wayne M.. Called contractor still have so things pending on the punch list,they need to fix. 03/07/2006 Approved per Wayne M. All corrections have been made. 6/12/07 1 year warranty - approved per Wayne M - 6/12/07 checked locate wire tracked good the project, valve cans, hydro, roads, meter box looked good.
Wastewater 01/17/2006 Corrections required per Wayne Macintosh.. Meet contractor and gave him a punch list to make corrections 03/03/2006 Corrections required per Wayne M.. Called contractor still have so things pending on the punch list,they need to fix. 03/07/2006 Approved per Wayne M. All corrections have been made. 6/12/07 1 year warranty - approved per Wayne M - 6/12/07 checked locate wire tracked good the project, valve cans, hydro, roads, meter box looked good.
Engineering 02/15/2006 Corrections required per Larry Henderson..Backfill behind sidewalk, remove forms from sidewalk, replace broken sidewalk, ramp ends of sidewalk, street and stop sign are wrong material and wrong posts. install monuments 02/27/2006 Corrections required per Larry Henderson.. Punch list items not done. 03/02/2006 Corrections required per Larry Henderson.. Backfill behind sidewalk, ramp ends of sidewalk, replace broken sidewalk, patch chipped curb, remove forms from meter collar, clean sidewalk, curb and street, install monuments. 03/15/2006 Ok for PERMITS ONLY. Corrections required per Carlos R. Stamp monumnets. 07/18/2006 Approved per Carlos Robles
City Development Engineer 03/09/2006 Corrections required per Cathy H.. 1. Electronic DWG of Record--need to tie sewer to TBC and prop. line(done).Revise storm drain info w/MH data, correct type,slope,size,catch basin,etc. 2.Ponding in waterway areas, 3. Waterways to abrupt for roadway design. 4. Monuments need to be installed. 03/15/2006 Approved per Jay Sandberg..FOR PERMITS ONLY!Please NOTE: Lots #92, #104, #103, need letter from GEOTECH per Jay Sandbreg. 07/18/2006 Approved per Jay Sandberg 6/6/07 1 year warranty - Corrections required per Ken B. Mud and trash in gutters. Curb shoulders chipped out and needs R/R In several locations (especially at knuckle on 280 N Gravel and rocks in gutter at knuckle).
Landscaping 02/15/2006 Corrections required per Mark Bradley.. Privacy wall and landscaping has not been installed. 02/23/2006 Approved per Mark Bradley.. N/A...NOTE:Plat H requires wall and street trees along Riverside Drive.. Prior to C.O. the rear yard is to be fence with blockwall. 6/6/07 1 year warranty - Corrections required per Ken B. Mud and trash in gutters. Curb shoulders chipped out and needs R/R In several locations (especially at knuckle on 280 N Gravel and rocks in gutter at knuckle).
    
General Comments: