| Drawing of Record Submitted | 02/27/2006..revised 03/16/2006 |
|---|---|
| Electronic Drawing | 02/27/2006..revised 03/16/2006 |
| Final Grading Report | 02/27/2006 |
| Date Scheduled | 02/27/2006 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | 02/27/2006 Approved per Dennis Wright |
| Water | 02/27/2006 Corrections required per Kevin Condie..1. Need to concrete valves 2. Flush and check chlorine on fire line. 3. Test backflow on landscaping. 4. Need to check wire. |
| Wastewater | 02/27/2006 Corrections required per Kevin Condie..1. Need to concrete valves 2. Flush and check chlorine on fire line. 3. Test backflow on landscaping. 4. Need to check wire. |
| Engineering | 03/01/2006 Approved per Larry Henderson |
| City Development Engineer | 03/03/2006 Approved 1. Electronic Dwg of record-need storm drain line size & slope, provide ties to sewer lateral locations(one from TBC and Corner of Bldg.) Send to [email protected] when revised. |
| Landscaping | 02/27/2006 Corrections required per Ray Snyder.. 1. Complete landscaping ( or provide copy of invoice with surety.)2. Complete trash enclouse with solid metal gate( or provide copy of quote with surety.)3. Complete parking lot striping. 4. Complete sidewalks. |
| General Comments: | |