River Park Comm..All Buildings
Number: Grading-34661

Drawing of Record Submitted
Electronic Drawing
Final Grading Report
Date Scheduled
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 03/30/2006 Approved per Kevin Condie.. Fire system have DC for Backflow-ok as per Wayne 1/23/07 Approved PHASE II per Tim Dotson 5/13/08 - 1 year warranty - approved per Carson Tait.
Wastewater 03/30/2006 Approved per Kevin Condie.. Fire system have DC for Backflow-ok as per Wayne 1/23/07 Approved PHASE II per Tim Dotson 5/13/08 - 1 year warranty - approved per Carson Tait.
Engineering 03/07/2006 Corrections required per Carlos Robles..Clean out boxes, detaining pond needs work,Finish wall, manhole, Final grading report, clean out waste from behind wall. 03/29/2006 Approved per Carlos Robles 5/19/2007 Approved per Carlkos Robles..1 yr waranty
City Development Engineer 03/08/2006 Approved per Jay Sandberg..Bldg 1-4 ok.. Not Bldg 5 & 6 5/7/07 BLDG 5 & 6 - Corrections required Per Ken B - Broken curbing needs R/R, cracks in curbing needs R/R, asphalt spauling, contractor trailer on-site, building material still on site, port-a-pot still on site, cuts and cracks in asphalt in several locations. Sight distance is blocked by bushes at main entrance on River Road. 6/7/07 approved per Cathy H. 5/7/08 - 1 year warranty - approved per Cathy H.
Landscaping 03/08/2006 Approved per Jay Sandberg.. Bldgs. 1-4 ok.. Not 5 & 6. 5/7/08 - 1 year warranty - approved per Cathy H.
    
General Comments: