Drawing of Record Submitted |
|
Electronic Drawing |
|
Final Grading Report |
|
Date Scheduled |
|
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
03/30/2006 Approved per Kevin Condie.. Fire system have DC for Backflow-ok as per Wayne
1/23/07 Approved PHASE II per Tim Dotson
5/13/08 - 1 year warranty - approved per Carson Tait. |
Wastewater |
03/30/2006 Approved per Kevin Condie.. Fire system have DC for Backflow-ok as per Wayne
1/23/07 Approved PHASE II per Tim Dotson
5/13/08 - 1 year warranty - approved per Carson Tait. |
Engineering |
03/07/2006 Corrections required per Carlos Robles..Clean out boxes, detaining pond needs work,Finish wall, manhole, Final grading report, clean out waste from behind wall.
03/29/2006 Approved per Carlos Robles
5/19/2007 Approved per Carlkos Robles..1 yr waranty |
City Development Engineer |
03/08/2006 Approved per Jay Sandberg..Bldg 1-4 ok.. Not Bldg 5 & 6
5/7/07 BLDG 5 & 6 - Corrections required Per Ken B - Broken curbing needs R/R, cracks in curbing needs R/R, asphalt spauling, contractor trailer on-site, building material still on site, port-a-pot still on site, cuts and cracks in asphalt in several locations. Sight distance is blocked by bushes at main entrance on River Road.
6/7/07 approved per Cathy H.
5/7/08 - 1 year warranty - approved per Cathy H. |
Landscaping |
03/08/2006 Approved per Jay Sandberg.. Bldgs. 1-4 ok.. Not 5 & 6.
5/7/08 - 1 year warranty - approved per Cathy H. |
| |
General Comments: |
|