| Drawing of Record Submitted | |
|---|---|
| Electronic Drawing | |
| Final Grading Report | |
| Date Scheduled | |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 03/30/2006 Approved per Kevin Condie.. Fire system have DC for Backflow-ok as per Wayne 1/23/07 Approved PHASE II per Tim Dotson 5/13/08 - 1 year warranty - approved per Carson Tait. |
| Wastewater | 03/30/2006 Approved per Kevin Condie.. Fire system have DC for Backflow-ok as per Wayne 1/23/07 Approved PHASE II per Tim Dotson 5/13/08 - 1 year warranty - approved per Carson Tait. |
| Engineering | 03/07/2006 Corrections required per Carlos Robles..Clean out boxes, detaining pond needs work,Finish wall, manhole, Final grading report, clean out waste from behind wall. 03/29/2006 Approved per Carlos Robles 5/19/2007 Approved per Carlkos Robles..1 yr waranty |
| City Development Engineer | 03/08/2006 Approved per Jay Sandberg..Bldg 1-4 ok.. Not Bldg 5 & 6 5/7/07 BLDG 5 & 6 - Corrections required Per Ken B - Broken curbing needs R/R, cracks in curbing needs R/R, asphalt spauling, contractor trailer on-site, building material still on site, port-a-pot still on site, cuts and cracks in asphalt in several locations. Sight distance is blocked by bushes at main entrance on River Road. 6/7/07 approved per Cathy H. 5/7/08 - 1 year warranty - approved per Cathy H. |
| Landscaping | 03/08/2006 Approved per Jay Sandberg.. Bldgs. 1-4 ok.. Not 5 & 6. 5/7/08 - 1 year warranty - approved per Cathy H. |
| General Comments: | |