Drawing of Record Submitted |
5/22/2007 |
Electronic Drawing |
5/22/2007 |
Final Grading Report |
5/22/2007 |
Date Scheduled |
5/23/2007 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
5/22/2007 Approved per Dennis Wright
1/2/2009 Approved per Dennis Wright..1 year warranty |
Water |
5/24/07 Corrections required per Kevin Condie. .Not Ready
5/31/07 approved per Kevin Condie.
1/9/09 - 1 year warranty - approved per Kevin C. |
Wastewater |
5/24/07 Corrections required per Kevin Condie. .Not Ready
5/31/07 approved per Kevin Condie.
1/9/09 - 1 year warranty - approved per Kevin C. |
Engineering |
5/30/2007 Corrections required per Carlos Robles.. Clean out all storm drains, no trash is allowed inside
6/14/07 approved per Carlos R.
1/06/2008 Approved per Carlos Robles.. 1 year warranty |
City Development Engineer |
5/29/07 corrections required per Cathy H. Electronic dwg of record needs to provide storm drain inlet info, line sizes, etc. It also needs to have the as-built point file attached. Need approval for shed by planning commission (tuff shed). Per Ken B - Berms present, construction materials still on site, asphalt spauling in many spots, metal gates missing off of trash enclosure. Hole in CMU Blk wall at rear. Curb needs R/R, and at side of bldg. Trash brl on site.
6/1/2007 Corrections required per Ken Bricker.. Rear storm drain grate is 2" above finish grade.
1/3/08 corrections required per Ken B. Storm Drain grate sits 2" above finish grade.
1/2/2008 Corrections requied per Ken Bricker.. Storm drain grate sits 2" above finsih grade
2/27/08 approved per Ken B.
1/6/09 - 1 year warranty - check on public street improvements (Riverside Drive ) - Approved per Ken B. |
Landscaping |
5/29/07 approved per Ken B.
1/9/09 - 1 year warranty - approved Larry S. |
| |
General Comments: |
|