| Drawing of Record Submitted | 07/17/2006 |
|---|---|
| Electronic Drawing | 07/17/2006 |
| Final Grading Report | 07/18/2006 |
| Date Scheduled | 07/20/2006 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 07/20/2006 Approved per Tim Dotson 8/6/07 - 1 year warranty - approved per Darrin Judd. Wire works, boxes, valves ok. |
| Wastewater | 07/20/2006 Approved per Tim Dotson 8/6/07 - 1 year warranty - approved per Darrin Judd. Wire works, boxes, valves ok. |
| Engineering | 7/25/06 Approved per Carlos R |
| City Development Engineer | 8/1/06 Corrections required per Brett B - 10% warranty bond. Rock wall certifications. Hillside compliance leter. 8/14/06 Corrections Required per Cathy H. 10% warranty bond. Revision to Hillside compliance letter (remove "substantial"). 8/21/07 - 1 year warranty - Corrections required per Cathy H. Remove and replace curb at location shown on subdivision plat. |
| Landscaping | 8/1/06 Approved per Brett B. 8/21/07 - 1 year warranty - Corrections required per Cathy H. Remove and replace curb at location shown on subdivision plat. |
| General Comments: | |