Drawing of Record Submitted |
06/21/2006 |
Electronic Drawing |
06/21/2006 |
Final Grading Report |
06/21/2006 |
Date Scheduled |
06/22/2006 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
6/22/06 Approved per Tim Dotson
9/13/2007 Approved per Carson Tait.. 1 yr warranty |
Wastewater |
6/22/06 Approved per Tim Dotson
9/13/2007 Approved per Carson Tait.. 1 yr warranty |
Engineering |
06/23/2006 Approved per Carlos Robles
9/11/2007 Approved per Carlos Robles 1yr warranty |
City Development Engineer |
6/26/06 Corrections Required per Cathy H. Pads are not built to approved elevations - complete per construction dwgs. Electronic dwg of record. 7/10/06 - Approved per Cathy with following condition - Pads to be build to elevation with first permit at footing and foundation inspection -- call in to Cathy for inspection of other 9 lots.
8/14/06 Corrections Required per Cathy H. Lot 8 and Lot 4 still need to come up to match TBC elevation. Clean up debris in public road from fill of lots.
10/3/06 Approved per Cathy H.
9/7/2007 Approved per Ken Bricker. 1 year warranty |
Landscaping |
10/3/06 Approved per Cathy H.
9/7/2007 Approved per Ken Bricker.. 1 year warranty |
| |
General Comments: |
|