| Drawing of Record Submitted | 06/21/2006 |
|---|---|
| Electronic Drawing | 06/21/2006 |
| Final Grading Report | 06/21/2006 |
| Date Scheduled | 06/22/2006 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 6/22/06 Approved per Tim Dotson 9/13/2007 Approved per Carson Tait.. 1 yr warranty |
| Wastewater | 6/22/06 Approved per Tim Dotson 9/13/2007 Approved per Carson Tait.. 1 yr warranty |
| Engineering | 06/23/2006 Approved per Carlos Robles 9/11/2007 Approved per Carlos Robles 1yr warranty |
| City Development Engineer | 6/26/06 Corrections Required per Cathy H. Pads are not built to approved elevations - complete per construction dwgs. Electronic dwg of record. 7/10/06 - Approved per Cathy with following condition - Pads to be build to elevation with first permit at footing and foundation inspection -- call in to Cathy for inspection of other 9 lots. 8/14/06 Corrections Required per Cathy H. Lot 8 and Lot 4 still need to come up to match TBC elevation. Clean up debris in public road from fill of lots. 10/3/06 Approved per Cathy H. 9/7/2007 Approved per Ken Bricker. 1 year warranty |
| Landscaping | 10/3/06 Approved per Cathy H. 9/7/2007 Approved per Ken Bricker.. 1 year warranty |
| General Comments: | |