[Desert Shadows Phase 1 @ Painted Desert]
Number: Grading-36437

Drawing of Record Submitted 07/27/2006..revised 8-16-06
Electronic Drawing 07/27/2006..revised 8-16-06
Final Grading Report 07/27/2006
Date Scheduled 08/01/2006
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 8/1/06 Approved per Tim Dotson 9/13/2007 Approved per Carson Tait.. 1 yr wararnty.. wire good
Wastewater 8/1/06 Approved per Tim Dotson 9/13/2007 Approved per Carson Tait.. 1 yr wararnty.. wire good
Engineering 8/1/06 Approved per Carlos R. 9/19/2007 Approved per Carlos Robles 1 yr warranty
City Development Engineer 8/14/06 Corrections Required per Cathy H. Show curb and gutter on electronic dwg of record w/ sewer lateral tie from TBC to lat (ok with prop to lateral). Open channel along back of North lots from original is piped. Needs to have SDMH for cleanouts. Cleanout detention basin box & debris out of basin. Remove conduit out of public row. Provide Hillside Compliance letter. Provide rock wall certifications. 08/16/2006 Corections required per Cathy H.. See Previous corrections 10/2/06 Approved per Cathy H. 9/17/07 1 year warranty - corrections required per Cathy H. Repair chipped curb in front of lot 8. Patch curb chips in front of lots 12 and 13. 12/4/08 - 1 year warranty - approved per Ken B
Landscaping 8/14/06 Corrections Required per Cathy H. Complete landscaping along 2450 S and up along drainage bench per plan with trees. 09/05/2006 Corrections required per Cathy H.. Complete landscaping along 2450 South and trees along Hillside before CO's issued. 10/2/06 Approved per Cathy H. 9/17/07 1 year warranty - corrections required per Cathy H. Repair chipped curb in front of lot 8. Patch curb chips in front of lots 12 and 13. 12/4/08 - 1 year warranty - approved per Ken B
    
General Comments: