Drawing of Record Submitted |
01/08/2007 |
Electronic Drawing |
01/09/2007 |
Final Grading Report |
12/28/2006 |
Date Scheduled |
1/10/2007 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
1/16/07 Approved per Dennis Wright.
12/10/2007 Approved per Dennis Wright.. 1 year warranty |
Water |
01/10/2007 (Irr).. Approved per Zene
1/11/07 WATER - corrections required per Kevin Condie. On Lot #207 & 208 need the traffic loaded box and lids because it fell in driveway. Concrete in meter box on lot #215. No water meter setter on lot #217 & 218. Setter needs to be centered in box. Low water pressure in meter setter at lot #223. Rebar in boxes is not under edge where lid sits. Hydrant on lot #232 has concrete on it - clean and paint. Check valve.
01/25/2007 Approved per Kevin Condie
12/11/2007 Approved per Wayne M.. 1 year warranty |
Wastewater |
01/10/2007 (Irr).. Approved per Zene
1/11/07 WATER - corrections required per Kevin Condie. On Lot #207 & 208 need the traffic loaded box and lids because it fell in driveway. Concrete in meter box on lot #215. No water meter setter on lot #217 & 218. Setter needs to be centered in box. Low water pressure in meter setter at lot #223. Rebar in boxes is not under edge where lid sits. Hydrant on lot #232 has concrete on it - clean and paint. Check valve.
01/25/2007 Approved per Kevin Condie
12/11/2007 Approved per Wayne M.. 1 year warranty |
Engineering |
01/11/2007 Approved per Brandon Wright |
City Development Engineer |
1/10/07 Corrections Required per Cathy H. Provide private development improvement certificate.
01/22/2007 Approved per Cathy H.
12/10/07 - 1 year warranty - Approved per Cathy H. |
Landscaping |
1/10/07 Approved per Ken B.
12/10/07 - 1 year warranty - Approved per Cathy H. |
| |
General Comments: |
|