Drawing of Record Submitted |
04/05/2006..revised 4-25-06 |
Electronic Drawing |
04/05/2006..revised 4-25-06 |
Final Grading Report |
04/12/2006 |
Date Scheduled |
04/06/2006 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
04/07/2006 Approved per Dennis Wright
4/5/07 1 year warranty approved per Dennis Wright. |
Water |
04/14/2006 Approved per Tim Dotson
5/24/07 1 year warranty approved per Tim Dotson. |
Wastewater |
04/14/2006 Approved per Tim Dotson
5/24/07 1 year warranty approved per Tim Dotson. |
Engineering |
04/07/2006 Corrections required per Carlos Robles.. Not Ready
04/21/2006 Approved per Carlos Robles |
City Development Engineer |
04/14/2006 Corrections required per Cathy H.. 1.Revise Dwg of record showing sewer co ties- 1 from SMH and 1 from top back of curb. Also show how storm water gets to detention area (we don't allow detention as labeled).2. Clean up site of construction debris in Southeast portion-clean rest of site. 3. 10% warranty bond on public improvements.4. Parking bumpers along areas where there is no curb especially in front of bldg. 5. Final grading report-comments from Carlos. 6. Replace trees east of the east access-over 3.5' insight cooridge or keep trees canapy above 8'.7. Doug W. to approve street trees. 8. Detention does not meet approved plan design-complete per plan.
4/13/07 - 1 year warranty - per Cathy H. Private - NA for inspection. |
Landscaping |
04/14/2006 Approved per Ray Synder..Inspected for landscape all trash enclosure (permited meltal framed T/E with solid vinyl siding).
04/14/2006 Approved per Doug W.
4/13/07 - 1 year warranty - per Cathy H. Private - NA for inspection. |
| |
General Comments: |
|