Drawing of Record Submitted |
10/18/2006 |
Electronic Drawing |
10/18/2006 |
Final Grading Report |
10/18/2006 |
Date Scheduled |
10/19/2006 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
10/19/06 Approved per Dennis Wright.
12/10/2007 Approved per Dennis Wright.. 1 yr warranty |
Water |
11/1/06 Approved per Kevin C.
12/11/2007 Approved per Wayne M.. 1 yr warranty.. check locate wire, located good |
Wastewater |
11/1/06 Approved per Kevin C.
12/11/2007 Approved per Wayne M.. 1 yr warranty.. check locate wire, located good |
Engineering |
10/23/06 Corrections Required per Brandon Wright. No sidewalk poured. Will go through rest of phase when ready.
1/12/2007.. Approved per Brandon Wright
12/13/2007 Approved per Brandon Wright 1 yr warranty |
City Development Engineer |
10/26/06 Corrections Required per Cathy H. Private improvement development certificate. per Ken B. End of road markers at Silver Cloud Drive Road and Long Sky Drive. Lot #250 & #251 Stack rock walls are incorrectly built retaining walls. General cleanup of streets.
01/12/2007 Approved per Cathy H.
12/10/07 - 1 year warranty - Approved per Cathy H. |
Landscaping |
10/26/06 Approved per Cathy H.
12/10/07 - 1 year warranty - Approved per Cathy H. |
| |
General Comments: |
|