Drawing of Record Submitted |
09/13/2006 |
Electronic Drawing |
09/13/2006 |
Final Grading Report |
09/13/2006 |
Date Scheduled |
09/18/2006 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
7/28/06 Corrections required per Kevin Condie. Needs BacT when they are ready. Need concrete around meter box. Valve up to sub grade or final grade if asphalt. Need all valves turned on. Need water to fire hydrants.
8/3/06 PERMITS ONLY OK per Tim Dotson |
Wastewater |
7/28/06 Corrections required per Kevin Condie. Needs BacT when they are ready. Need concrete around meter box. Valve up to sub grade or final grade if asphalt. Need all valves turned on. Need water to fire hydrants.
8/3/06 PERMITS ONLY OK per Tim Dotson |
Engineering |
7/27/06 Corrections required per Carlos R - Finish project - sewer; water.
8/3/06 PERMITS ONLY OK per Carlos R |
City Development Engineer |
7/27/06 Corrections required per Brett B - Finish concrete around water valves and service. 8/1/06 Approved per Brett B |
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
|
Water |
09/22/2006 Approved Per Tim Dotson.. Lots #31 & #23
9/26/2007 Approved per Wayne M.. 1 year warranty.. Checked locate wire traced out good |
Wastewater |
09/22/2006 Approved Per Tim Dotson.. Lots #31 & #23
9/26/2007 Approved per Wayne M.. 1 year warranty.. Checked locate wire traced out good |
Engineering |
09/25/2006 Corrections required per Carlos Robles..Clean out storm drain , clean streets, remove dirt ramps, sidewalks will be inspected @ c/o.
1/17/2008 Approved per Carlos Robles 1 yr wararnty |
City Development Engineer |
10/10/06 Approved per Brandon Wright.
9/10/07 - 1 year warranty - approved per Ken B. |
Landscaping |
9/22/06 Approved per Ken B
9/10/07 - 1 year warranty - approved per Ken B. |
| |
General Comments: |
|