Sun River Phase 23
Number: Grading-36552

Drawing of Record Submitted 09/13/2006
Electronic Drawing 09/13/2006
Final Grading Report 09/13/2006
Date Scheduled 09/18/2006
BUILDING PERMIT RELEASE APPROVALS
Power
Water 7/28/06 Corrections required per Kevin Condie. Needs BacT when they are ready. Need concrete around meter box. Valve up to sub grade or final grade if asphalt. Need all valves turned on. Need water to fire hydrants. 8/3/06 PERMITS ONLY OK per Tim Dotson
Wastewater 7/28/06 Corrections required per Kevin Condie. Needs BacT when they are ready. Need concrete around meter box. Valve up to sub grade or final grade if asphalt. Need all valves turned on. Need water to fire hydrants. 8/3/06 PERMITS ONLY OK per Tim Dotson
Engineering 7/27/06 Corrections required per Carlos R - Finish project - sewer; water. 8/3/06 PERMITS ONLY OK per Carlos R
City Development Engineer 7/27/06 Corrections required per Brett B - Finish concrete around water valves and service. 8/1/06 Approved per Brett B
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 09/22/2006 Approved Per Tim Dotson.. Lots #31 & #23 9/26/2007 Approved per Wayne M.. 1 year warranty.. Checked locate wire traced out good
Wastewater 09/22/2006 Approved Per Tim Dotson.. Lots #31 & #23 9/26/2007 Approved per Wayne M.. 1 year warranty.. Checked locate wire traced out good
Engineering 09/25/2006 Corrections required per Carlos Robles..Clean out storm drain , clean streets, remove dirt ramps, sidewalks will be inspected @ c/o. 1/17/2008 Approved per Carlos Robles 1 yr wararnty
City Development Engineer 10/10/06 Approved per Brandon Wright. 9/10/07 - 1 year warranty - approved per Ken B.
Landscaping 9/22/06 Approved per Ken B 9/10/07 - 1 year warranty - approved per Ken B.
    