[Ledges (The) Phase I]
Number: Grading-36646

Drawing of Record Submitted 09/05/2006
Electronic Drawing 09/05/2006
Final Grading Report 09/05/2006
Date Scheduled 09/06/2006
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 09/07/2006 Approved per Dennis Wright 9/7/07 - 1 year warranty - Approved per Dennis Wright.
Water 9/15/06 Approved per Kevin Condie 12/04/2007 Approved per Tim Dotson.. 1 year warranty..
Wastewater 9/15/06 Approved per Kevin Condie 12/04/2007 Approved per Tim Dotson.. 1 year warranty..
Engineering 09/08/2006 Corrections required per Brandon Wright.. Street signs, street lights, backfill behind walk, clean,cut grout, storm drain /boxes. /remove rock from lots, finish wall, remove pile of gravel from road 09/22/2006 Approved per Brandon Wright 9/13/2007 Corrections required per Brandon Wright..1 yr warranty.. repairs to be made 2/5/08 - 1 year warranty - corrections required per Brandon Wright. Broken Curb and broken walk to be fixed. 6/26/2008 Approved per Brandon Wright.. 1yr warranty
City Development Engineer 09/07/2006 Corrections required per Ken B.. Gravel pile in street, trash in catch basin, building materials in street. 9/21/06 Corrections Required per Ken B. Gutter full of sand and dirt, catch basins blocked off and rocks being stacked on their ends on Ledges Parkway. 10/03/2006 Approved per Cathy H. 9/7/2007 Approved per Ken Bricker.. 1 year warranty
Landscaping 09/07/2006 Corrections required per Ken B... No Landscaping present 9/21/06 Corrections Required per Cathy H. Need landscaping bond. 10/03/2006 Approved per Cathy H.. Holding L/S Bond 9/7/2007 Approved per Ken Bricker 1 year warranty
    
General Comments: