Drawing of Record Submitted |
1/07/2008..revised 1 copy 1/29/08 |
Electronic Drawing |
1/07/2008 |
Final Grading Report |
1/9/2008 |
Date Scheduled |
1/09/2008 |
BUILDING PERMIT RELEASE APPROVALS |
Power |
|
Water |
|
Wastewater |
|
Engineering |
|
City Development Engineer |
|
Landscaping |
|
FINAL INSPECTION RELEASE APPROVALS |
Power |
1/9/2008 Approved per Dennis Wright
Approved per Dennis Wright.. 1 year warranty |
Water |
1/10/2008 Corrections required per Wayne M.. paint Fire hyd need drawing of Records checked locate wire and it is good.
1/15/2008 Approved per Wayne M.. Corrections have been made,need to have concrete collars around Hyd and meter up by DixieBattery and meter near to lot on the North of the project before that building pass a Final CO.
12/17/08 - 1 year warranty - approved per Daren Judd. |
Wastewater |
1/10/2008 Corrections required per Wayne M.. paint Fire hyd need drawing of Records checked locate wire and it is good.
1/15/2008 Approved per Wayne M.. Corrections have been made,need to have concrete collars around Hyd and meter up by DixieBattery and meter near to lot on the North of the project before that building pass a Final CO.
12/17/08 - 1 year warranty - approved per Daren Judd. |
Engineering |
1/9/2008 Corrections required per Brandon Wirght..Curb & gutter not finished North end,trash enclosure not built,final grading report show no tests on curb & gutter,asphalt or utilities or sidewalk, patch curb, no landscape plan available, need to meet with Scott Snow on ramps on sunset.
1/14/2008 Approved per Brandon Wright
12/5/08 - 1 year warranty - approved per Brandon W. |
City Development Engineer |
1/9/08 corrections required per Cathy H. Electronic DWG of record needs to show as constructed on the storm drain(remove language such as to be installed, etc.) Provide Inv. in and out with rims at all locations. The sewer needs to s how run elev inverts in and out, etc. plus size and type of pipe. Also, needs to have ties to cleanouts to find in the future. Per Ken B. Trash enclosure not built, concrete collars not present, fire hydrant pad is missing, ADA signage is missing, curb missing.
1/14/08 corrections required per Ken B. Trash enclosure not built yet, North side of lot not landscaped (no bond received 1/14/08)
1/16/08 approved per Cathy H. Received bond for trash enclosure - Cashier's Check #024869.
12/3/08 - 1 year warranty - NA per Cathy H. No public improvements. |
Landscaping |
1/9/08 corrections required Per Ken B. Trash enclosure not built, concrete collars not present, fire hydrant pad is missing, ADA signage is missing, curb missing.
1/14/08 corrections required per Ken B. Trash enclosure not built yet, North side of lot not landscaped (no bond received 1/14/08)
1/16/08 approved per Cathy H. Received bond for trash enclosure - Cashier's Check #024869.
11/08/2008 Approved per Larry Shane .. 1 year warranty |
| |
General Comments: |
|