[Sun River Phase 26]
Number: Grading-36700

Drawing of Record Submitted 5/7/2008
Electronic Drawing 5/7/2008
Final Grading Report 5/7/2008
Date Scheduled 5/8/2008
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power
Water 5/12/08 not ready per Kevin C. 6/20/2008 Approved per Kevin Condie 5/5/2009 Approved per Kevin Condie 1 year warranty
Wastewater 5/12/08 not ready per Kevin C. 6/20/2008 Approved per Kevin Condie 5/5/2009 Approved per Kevin Condie 1 year warranty
Engineering 6/12/08 approved per Carlos R. 4/14/2009 Approved per Carlos Robles 1 year warranty
City Development Engineer 5/12/05 corrections required per Cathy H. Electronic dwg of record needs to be placed on city HCN system (off to the South approx 250'). 5/21/08 approved per Cathy H . 4/3/2009 Approved per Cathy H.. 1 year warranty.. Check public streets- Arrowhead Canyon & Sun River Pkway
Landscaping 5/12/05 approved per Ken B. 4/15/09 1 YEAR WARRANTY - approved per Pam Klotz.
    
General Comments: