[Milne Subdivision]
Number: Tracking-36702

Drawing of Record Submitted
Electronic Drawing
Final Grading Report
Date Scheduled
BUILDING PERMIT RELEASE APPROVALS
Power
Water
Wastewater
Engineering
City Development Engineer
Landscaping
FINAL INSPECTION RELEASE APPROVALS
Power 05/03/2006 Corrections required per Dennis Wright. No Utilities placed for all lots at this time. 09/01/2006 Approved per Dennis Wright.. Power installed no other development done. 12/10/2007 Approved per Dennis Wright.. 1 yr warranty
Water 1/3/07 Approved with conditions per Tim Dotson - lot 1 okay. Lots 2 and 3 to be improved by owners (Received by Cathy H). Prior to CO on lot 1 - setter/meter must be collared per St George Specs. 12/11/2007 Approved per Tim Dotson 1 yr warranty
Wastewater 1/3/07 Approved with conditions per Tim Dotson - lot 1 okay. Lots 2 and 3 to be improved by owners (Received by Cathy H). Prior to CO on lot 1 - setter/meter must be collared per St George Specs. 12/11/2007 Approved per Tim Dotson 1 yr warranty
Engineering 1/3/07 Approved per Carlos R. 12/17/2007 Approved per Calros Robles 1yr warranty
City Development Engineer 5/4/06 - Corrections REQUIRED per Wes Jenkins - complete improvements per plan. 9/29/06 Corrections Required per Cathy H. Requires letter from owner of lots 2 & 3 on utility installation. 1/2/07 Approved per Cathy H . Received recorded letter - owners to make utility improvements 12/12/07 - 1 year warranty - approved per Ken B.
Landscaping 05/02/2006 Approved per Mark Bradley..N/A 12/12/07 - 1 year warranty - approved per Ken B.
    
General Comments: