| Drawing of Record Submitted | 05/10/2006 |
|---|---|
| Electronic Drawing | 05/05/2006 |
| Final Grading Report | 05/05/2006 |
| Date Scheduled | 05/15/2006 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 05/19/2006 Corrections required per Tim Dotson.. Need to pour concrete around meter box. 5/26/06 Corrections Required per Tim Dotson - Need lid on meter box. 5/30/06 Approved per Tim Dotson 04/30/2007 Approved per Kevin Condie.. 1 year warranty |
| Wastewater | 05/19/2006 Corrections required per Tim Dotson.. Need to pour concrete around meter box. 5/26/06 Corrections Required per Tim Dotson - Need lid on meter box. 5/30/06 Approved per Tim Dotson 04/30/2007 Approved per Kevin Condie.. 1 year warranty |
| Engineering | 05/17/2006 Corrections required per Carlos Robles..Light poles, detention basin, Driveway approach not as per plans. 05/26/2006 Approved per Carlos Robles.. South Driveway approach not as per plans |
| City Development Engineer | 4/13/07 - 1 year warranty - per Cathy H. Private parking lot - NA for inspection. |
| Landscaping | 5/24/06 Approved per Jay Sandberg 4/13/07 - 1 year warranty - per Cathy H. Private parking lot - NA for inspection. |
| General Comments: | |