| Drawing of Record Submitted | 11/27/2006..revised 12/05/2006 |
|---|---|
| Electronic Drawing | 11/27/2006..revised 12/05/2006 |
| Final Grading Report | 11/27/2006 |
| Date Scheduled | 11/28/2006 |
| BUILDING PERMIT RELEASE APPROVALS | |
| Power | |
| Water | |
| Wastewater | |
| Engineering | |
| City Development Engineer | |
| Landscaping | |
| FINAL INSPECTION RELEASE APPROVALS | |
| Power | |
| Water | 11/28/2006 Approved per Tim Dotson |
| Wastewater | 11/28/2006 Approved per Tim Dotson |
| Engineering | 11/28/2006 Corrections required per Carlos.. Finish Project 12/07/2006 Approved per Carlos Robles |
| City Development Engineer | 11/28/06 Corrections required per Ken B. Construction still present in parking area at rear. Gravel base w/ walls not installed yet. per Cathy H. Electronic dwg of record - c.o. for sewer laterals need to be tied to TBC not property. 12/7/06 Corrections required per Ken B - Contractor's trailer still on site. Curbing needed at side access due to dropoff from asphalt. 11/05/2007 Approved per Ken B |
| Landscaping | 11/28/06 Approved per Ken B. |
| General Comments: | |